This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals.
- The work includes;
- Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source.
- Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source.
- Installation of 2 combination air-vacuum valves with utility boxes.
- Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.