DEPT OF DEFENSE › DEPT OF THE ARMY › US ARMY CORPS OF ENGINEERS › ENGINEER DIVISION NORTH ATLANTIC › ENDIST NEW ENGLAND › W2SD ENDIST NEW ENGLAND
Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA
Key facts
- Response deadline
- Mar 11, 2026
- 1:00 PM UTC-04:00
- Set-aside
- Not stated
- Notice type
- Solicitation
- Posted on SAM.gov
- Mar 6, 2026
- Archives Mar 6, 2027
Description
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con?structed within the grounds of CCSFS in fa?cilities which are in restricted areas requir?ing enhanced security protocols. The im?pacted facilities are to remain occupied throughout construction with minimal dis?ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en?ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa?cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con?trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera?tors, uninterrupted power supplies, critical and non-critical power distribution re?sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis?sion critical operations and impacted pro?tective HEMP barriers.
From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).
Contacts
Tyler Maryak · primary
Ann Adley · secondary
Attachments
BidLookup records the links this notice gives. It has not downloaded or checked the files.
Record dates
- Posted on SAM.gov: Mar 6, 2026
- The agency’s publication date, as SAM.gov states it.
- First recorded by BidLookup: Oct 8, 2026
- The UTC day of the first read of SAM.gov’s listings that stored this notice.
- Last confirmed: Oct 23, 2026
- The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
- Description as published: Oct 24, 2026 (UTC)
- The date of the daily data file this text came from.
Published by the agency on SAM.gov as notice f9e536186d354e0e861a8368edb3182b. What these dates mean
Record
- Solicitation number
- W912WJ26RA003
- Search the index for this number
- NAICS
- 237130 · Power and Communication Line and Related Structures Construction
- Product/service code
- Y1QA · CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
- Place of performance
- Bourne, Massachusetts
- Contracting office
- CONCORD, MA 01742-2751
- SAM.gov notice ID
- f9e536186d354e0e861a8368edb3182b