Skip to main content

← Back to results

DEPT OF DEFENSE › DEPT OF THE ARMY › US ARMY CORPS OF ENGINEERS › ENGINEER DIVISION NORTHWESTERN › ENDIST SEATTLE › W071 ENDIST SEATTLE

FY26 Willapa Bay Maintenance Dredging Bid Opening Details

Key facts

Response deadline
Jan 13, 2026
12:30 PM UTC-08:00
Set-aside
Not stated
Notice type
Solicitation
Posted on SAM.gov
Jan 15, 2026
Archives Dec 15, 2026

Description

Please see attached Amendment 0003 for complete details. Willapa Harbor Maintenance Dredging project in Willapa Harbor, Washington. USACE, Seattle District has been tasked to solicit for and award a construction contract to maintenance dredge the Bay Center, Nahcotta, and Tokeland Federal Navigation Channels to their authorized depths. Up to 180,000 CY is expected to be dredged across the three features via mechanical clamshell dredging. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft (Tokeland), MLLW, +2 ft overdepth at each location. In addition, dredging approximately 10,000 CY to a minimum depth of -9 ft MLLW (+1 ft overdepth) may be required in the Bay Center/Palix River Access Lane to ensure sufficient water depths for the dredge, scow, and tugboats to transit between Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay. Dredged material will be disposed via bottom dump scow at the Cape Shoalwater open-water dispersive disposal site or the South Channel open-water dispersive disposal site. Work is anticipated to begin in summer 2026. The work window varies by project features. For any given calendar year, the in-water work windows are as follows:? Bay Center/Palix River: 16 Jul through 30 Sep? Nahcotta: 16 Jul through 01 Feb? Tokeland:
Show more
16 Jul through 15 FebWillapa Bay presents significant navigational hazards due to its exposed Pacific Ocean entrance, unmaintained channels, shifting shoals, and unpredictable weather. This performance window includes the worst season for storm and marine conditions. The U.S. Coast Guard has removed aids-to-navigation at Willapa Bar because of unreliable conditions, and their Waterways Analysis notes over 50 unreported groundings annually. These hazards present serious safety concerns for contractors and local users, complicating mobilization and dredging operations throughout the project area.In accordance with Federal Acquisition Regulation (FAR) Part 36 , the estimated construction price range for this project is: Between $5,000,000 and $10,000,000. Estimated duration of the dredging activities is 3-7 months. PLEASE SEE THE ATTACHED SOLICITATION, SPECIFICATIONS AND DRAWINGS FOR INSTRUCTIONS ON SUBMITTING A BID IN RESPONSE TO THE SOLICITATION.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Jan 15, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice f7acabc248894ad18f498738555a5fd1. What these dates mean

Record

Solicitation number
W912DW26BA001
Search the index for this number
NAICS
237990 · Other Heavy and Civil Engineering Construction
Product/service code
Y1KF · CONSTRUCTION OF DREDGING FACILITIES
Place of performance
98640
Contracting office
SEATTLE, WA 98134-2329
SAM.gov notice ID
f7acabc248894ad18f498738555a5fd1