Skip to main content

← All opportunities

DEPT OF DEFENSE › DEPT OF THE NAVY › NAVFAC › NAVFAC PACIFIC CMD › NAVFAC SOUTHWEST SW › NAVFACSYSCOM SOUTHWEST

Design-Build MILCON Project P-481 Energy Resilience Phases 3 and 4 at Mountain Range Warfare Training Center (MWTC), Bridgeport, CA.

Key facts

Response deadline
Dec 4, 2025
2:00 PM UTC-08:00
Set-aside
Not stated
Notice type
Solicitation
Posted on SAM.gov
Nov 14, 2025
Archives Dec 31, 2026

Description

Design-Build MILCON Project P-481 Energy Resilience Phases 3 and 4 at Mountain Range Warfare Training Center (MWTC), Bridgeport, CA.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

No attachment links are available here.

Record dates

Posted on SAM.gov: Nov 14, 2025
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice eb044afadf324a6096dfe13688e73a82. What these dates mean

Record

Solicitation number
N6247325R0056
Search the index for this number
NAICS
237130 · Power and Communication Line and Related Structures Construction
Product/service code
Z2NZ · REPAIR OR ALTERATION OF OTHER UTILITIES
Place of performance
93517
Contracting office
SAN DIEGO, CA 92132-0001
SAM.gov notice ID
eb044afadf324a6096dfe13688e73a82