CO NP ROMO 407(1) Holzwarth Culvert

Key facts

Response deadline
Oct 27, 2026
2:00 PM UTC-06:00
Set-aside
No set-aside
No Set aside used
Notice type
Solicitation
Posted on SAM.gov
Oct 19, 2026
Archives Dec 20, 2026

Description

Show the full description
SOLICITATION ID: 6982AF27B000004 PROJECT NUMBER: CO FTNP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities. SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. The site is accessible on foot a quarter mile past the locked gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources.End of the preview. Use “Show the full description” above to read all of it.

SOLICITATION ID:  6982AF27B000004

PROJECT NUMBER: CO FTNP ROMO 407(1)
PROJECT NAME: Holzwarth Culvert

PROJECT DESCRIPTION:
This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities.

SCOPE OF THE WORK:
The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. The site is accessible on foot a quarter mile past the locked gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100’ west of the bridge.

PRINCIPAL WORK ITEMS:
20304-2000 Removal of Bridge: 1 EACH
30202-2000 Roadway Aggregate, Method 2: 120 TON
55504-0000 Prefabricated Steel Bridge (10’ wide x 48’ long modular steel vehicular bridge): 1 LPSM
56701-0000 Micropile (8.68” dia.): 180 LNFT
62801-0000 Temporary Stream Diversion: 1 LPSM


ANTICIPATED SCHEDULE:
Advertisement – September 2026
Award – December 2026
NTP – December 2026
Contract Completion – November 2027

ESTIMATED COST RANGE:
Total estimated cost between $700,000 and $2,000,000.

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Oct 19, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 19, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 19, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.

Published by the agency on SAM.gov as notice e80699037ab6447aa8a6ffc6cfc7cb65. What these dates mean

Record

Solicitation number
6982AF27B000004
Search the index for this number
NAICS
237310 · Highway, Street, and Bridge Construction
Product/service code
Y1LB · CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Place of performance
Grand Lake, Colorado 80447
Contracting office
LAKEWOOD, CO 80228
SAM.gov notice ID
e80699037ab6447aa8a6ffc6cfc7cb65