Skip to main content

← All opportunities

DEPT OF DEFENSE › DEPT OF THE ARMY › US ARMY CORPS OF ENGINEERS › ENGINEER DIVISION NORTH ATLANTIC › ENDIST NEW ENGLAND › W2SD ENDIST NEW ENGLAND

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Key facts

Response deadline
Nov 6, 2026
1:00 PM UTC-05:00
Set-aside
Not stated
Notice type
Solicitation
Posted on SAM.gov
Oct 6, 2026
Archives Sep 9, 2027

Description

The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines.
Show more
The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Oct 6, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 9, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 19, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice e6f9fd689b4541e6ba8d2cabbccdeec6. What these dates mean

Record

Solicitation number
W912WJ26RA008
Search the index for this number
NAICS
236220 · Commercial and Institutional Building Construction
Product/service code
Y1NB · CONSTRUCTION OF HEATING AND COOLING PLANTS
Place of performance
West Haven, Connecticut
Contracting office
CONCORD, MA 01742-2751
SAM.gov notice ID
e6f9fd689b4541e6ba8d2cabbccdeec6