Skip to main content

← All opportunities

TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 6982AF CENTRAL FEDERAL LANDS DIVISI

HI FLAP CR562(1) Kilauea Point

Key facts

Response deadline
No deadline given
Set-aside
No set-aside
No Set aside used
Notice type
Presolicitation
Posted on SAM.gov
Oct 15, 2026
Archives Nov 15, 2026

Description

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NAME: HI FLAP CR562(1) Kilauea Point PROJECT DESCRIPTION: Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook. The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles. PRINCIPAL WORK ITEMS:
Show more
18,500 square yards of Removal of Pavement, Asphalt 3,370 cubic yards of Roadway Excavation 2,900 ton of Roadway Aggregate, Method 2 4,200 ton of Asphalt Concrete pavement, Type 1 630 square yard of minor concrete Pavement, Reinforced 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted) 5,670 square yards of Sidewalk, Concrete 34 Accessibility Ramps, Concrete ANTICIPATED SCHEDULE: Advertise: End of October or Early November 2026 Bid Opening: December 2026 Award: January 2027 Construction: January 2027 –January 2028 ESTIMATED COST RANGE: The anticipated cost range is between 10,000,000 and $20,000,000.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

No attachment links are available here.

Record dates

Posted on SAM.gov: Oct 15, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 16, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice dc14203ba77443638a2488066e588f26. What these dates mean

Record

Solicitation number
6982AF27B000008
Search the index for this number
NAICS
237310 · Highway, Street, and Bridge Construction
Product/service code
Y1LB · CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Place of performance
Kilauea, Hawaii
Contracting office
LAKEWOOD, CO 80228
SAM.gov notice ID
dc14203ba77443638a2488066e588f26