Skip to main content

← All opportunities

DEPT OF DEFENSE › DEPT OF THE ARMY › AMC › ACC › MISSION INSTALLATION CONTRACTING COMMAND › 419TH CSB › W6QM MICC-FT STEWART

Fire Extinguisher Service

Key facts

Response deadline
Sep 21, 2026
5:00 PM UTC-04:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Combined synopsis/solicitation (originally Presolicitation)
Posted on SAM.gov
Sep 14, 2026
Archives Oct 6, 2026

Description

This is a solicitaion for a base plus four contract. The services is to maintain, inspect and test various fire extinguishers in multiple buildings on Hunter Army Airfield GA. Please see attached PWS for detailed requirements, part 5 of PWS is outlined below. Submission requirments. Filled out and signed SF 1449 Technical Proposal of the services Quote broken down by CLINs UEI and SBA certifications. Questions are to be submitted until 1700 EST 17SEP2026 PART 5 SPECIFIC TASKS 5. Specific Tasks: Tasks will be performed in accordance with NFPA 10, AR 420-5, and OSHA regulations. 5.1. The Contractor shall execute quarterly service dispatches to inspect and remediate 100% of inventory fire extinguishers, ensuring correction of all deficiencies within 5 business days. 5.2. The required fire extinguisher periodic maintenance includes annual inspections, 5/6 years maintenance (depending on the extinguisher type), and 10/12-year hydrostatic testing (depending on the extinguisher type). 5.3. Pressurized fire extinguishers require the following services (inspection, maintenance, and/or hydrostatic testing). 5.4. New extinguishers require an initial inspection to confirm the weight, pressure, condition, and provide the record on an inspection tag; all conducted by qualified personnel. 5.5. Annual inspections/maintenance includes full mechanical check, weighing, and servicing by qualified personnel. 5.6. During 5/6 year maintenance, extinguishers must be disassembled, emptied, and serviced. 5.7.
Show more
Hydrostatic testing involves the same process as 5/6 year maintenance with an addition structural test to ensure cylinder integrity. 5.8. 14 Days to perform service, unless an understanding is agreed upon between the unit POC, the contracting officer, and the contractor. In the event a unit is activated for deployment, the Government will not be responsible to pay for the quarterly services not used under the contract. The contractor will be notified by the COR, in writing, explaining the length of the deployment and the period during which services will not be required for a particular unit. The contractor will cease billing during the period during which services will not be required for a particular unit.

From SAM.gov’s daily data file, as published on Sep 29, 2026 (UTC). SAM.gov’s latest daily file no longer lists this notice.

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Sep 14, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Sep 20, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Sep 20, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Sep 29, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice d21f2c60c3764a8796a2de810f5f3d83. What these dates mean

Record

Solicitation number
W9124M26QA025
Search the index for this number
NAICS
811310 · Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
Product/service code
J012 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FIRE CONTROL EQUIPMENT
Place of performance
Georgia 31409
Contracting office
FORT STEWART, GA 31314-3324
SAM.gov notice ID
d21f2c60c3764a8796a2de810f5f3d83