Skip to main content

← All opportunities

DEPT OF DEFENSE › DEPT OF THE ARMY › US ARMY CORPS OF ENGINEERS › SCO ALEXANDRIA › SUPPORT CENTER HUNTSVILLE › W2V6 USA ENG SPT CTR HUNTSVIL

PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona

Key facts

Response deadline
Jul 27, 2026
9:00 AM UTC-05:00
Set-aside
WOSBWomen-owned small business
SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
Notice type
Solicitation
Posted on SAM.gov
Jul 15, 2026
Archives Jul 15, 2027

Description

The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities.
Show more
The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

No attachment links are available here.

Record dates

Posted on SAM.gov: Jul 15, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice d163bbe08eee4f0cac774eb131a9a25e. What these dates mean

Record

Solicitation number
W912DY26RA107
Search the index for this number
NAICS
238910 · Site Preparation Contractors
Product/service code
P400 · SALVAGE- DEMOLITION OF BUILDINGS
Place of performance
Yuma, Arizona
Contracting office
REDSTONE ARSENAL, AL 35898-0000
SAM.gov notice ID
d163bbe08eee4f0cac774eb131a9a25e