LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

Key facts

Response deadline
Apr 24, 2026
10:00 AM UTC-05:00
Set-aside
No set-aside
No Set aside used
Notice type
Solicitation
Posted on SAM.gov
Apr 23, 2026
Archives Dec 31, 2026

Description

***Amendment 0006 The purpose of this amendment is to incorporate tax exemption language. All other terms and changes remain unchanged. ***Amendment 0005 The purpose of this amendment is to remove FAR clause 52.236-16 and replace it with FAR 52.236-16 Alternate 1. This amendment also incorporates updated drawing sheets GI002 and CG203. All other terms and conditions remain unchanged. ***Amendment 0004 This amendment is issued to provide replies to ProjNet Bidder Inquiries as of 8 Aprio, and make all resulting changes. See attachments for full details of Amendment 0004. ***Amendment 0003 This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST, 3 April 2026. There are some attachments that must be requested in order to be provided via DoD SAFE. See attachments for full details of amendment 0003. ***Amendment 0002 This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026: ***Amendment 0001 This amendment is issued to make administrative updates to the solicitation. ***Proposal will be submitted via EMAIL Angie Grimes at [email protected] and Whitney Dee at [email protected] The U. S. Army Corps of Engineers, St.
Show more
Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Apr 23, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice d02f3cee343848308827514798f3e1e4. What these dates mean

Record

Solicitation number
W912P926RA001
Search the index for this number
NAICS
237990 · Other Heavy and Civil Engineering Construction
Product/service code
Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Place of performance
Winfield, Missouri 63389
Contracting office
SAINT LOUIS, MO 63103-2833
SAM.gov notice ID
d02f3cee343848308827514798f3e1e4