Skip to main content

← All opportunities

ENERGY, DEPARTMENT OF › BROOKHAVEN NATL LAB -DOE CONTRACTOR

Building 510 Substation Upgrade - Phase I

Key facts

Response deadline
Oct 23, 2026
4:00 PM UTC-04:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Sources sought
Posted on SAM.gov
Oct 12, 2026
Archives Nov 7, 2026

Description

Notice of Interest: BSA is seeking interested contractors capable of performing the work describled below and interested in receiving the forthcoming solicitation. The formal solicitation will be issued at a later date and will also be posted on SAM.gov at that time. Note that switchgear and transformers are being provided to the contractor as Government Furnished Equipment (GFE). Interested contractors are invited to submit a statement of interest along with a capabilities statement to BSA's Contract Specialist, Megan Howard, at [email protected]. Please include your Sam.gov Unique Entity Identifier (UEI). Project Description: The Physics Building was constructed in 1962 and much of the electrical system, original to the building, is beyond its useful life. These systems are also not compliant with current building codes, contain hazardous materials and need complete upgrades. The existing protective devices may not operate as specified, increasing the potential for arc-flash hazards and system damaging electrical faults. Repairs are cost prohibitive and may lead to extended unplanned outages in this mission critical facility. The Contractor shall provide all labor, supervision, materials (except as noted below), equipment, and services necessary for complete removal and upgrading of the existing Building 510 electrical substation equipment that feeds the newly replaced electrical distribution switchgear.
Show more
This project includes the removal of two medium voltage substation transformers, one medium voltage oil switch and medium voltage distribution cabling. The project also includes the installation of a new exterior substation with two new medium voltage transformers, one pad mounted medium voltage switchgear and medium voltage feeders in a new concrete encased duct bank. The new substation will be constructed in the north-loading dock parking lot, complete with new transformer and switchgear pads, grounding and crushed stone. Long lead electrical equipment procurements are planned early in the project and construction of the substation infrastructure can be completed in parallel. Once the cutovers are completed the old transformers and oil switch will be removed from the equipment vault in the basement of Building 510. The Contractor shall not procure the switchgear or transformers under this contract. Installation will be executed in a phased approach in order to minimize electric service disruptions to the building and will provide provisions for future redundant circuit configuration.

From SAM.gov’s daily data file, as published on Nov 7, 2026 (UTC). SAM.gov’s latest daily file no longer lists this notice.

Contacts

Attachments

No attachment links are available here.

Record dates

Posted on SAM.gov: Oct 12, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 15, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 7, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Nov 7, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice c59f6b8179ec49cc937da49033f9dd0b. What these dates mean

Record

Solicitation number
MH484019
Search the index for this number
NAICS
238210 · Electrical Contractors and Other Wiring Installation Contractors
Product/service code
Z2NZ · REPAIR OR ALTERATION OF OTHER UTILITIES
Place of performance
New York 11973
Contracting office
Upton, NY 11973
SAM.gov notice ID
c59f6b8179ec49cc937da49033f9dd0b