Show the full descriptionShow less
1 - SF 1449 is amended as follows: a) Block 20 - "30 days" is changed to "60 days" b) Block 28 is checked, quoter to sign and return 1 copy; quoters must sign block 30 and return to the CO c) Block 27a - FAR52.212-3 and FAR 52.212-5 were rescinded with the FAR Overhaul and are not applicable to this solicitation. 2 Section B.1 Invoices Paragraph 3(c) is changed to read: Other [X] After Acceptance. 3 Additional Requirements (page 7) is replaced as follows (affected words underlined). The product manufacturer s date cannot exceed 24 months (2 years) before the purchase order award date. The equipment must be unused and not refurbished, and it shall have the latest software and hardware updates installed by the manufacturer. Batteries included with the unit must have been manufactured within 6 (six) months of the purchase order award date. Service Manuals, including the theory of operation, maintenance requirements, repair information, schematics, part lists, and troubleshooting details, will be provided to the VA HTM Department in electronic format within three (3) days of delivery. Warranty information regarding parts and labor must be provided for all procured products in electronic format. Documentation must be sent to both the IOT&A contractor and the VA HTM Department within three (3) days of delivery. 4 Note on purchase order award date The government anticipates making the purchase order award in early December 2026. 5 Confidentiality and Non-Disclosure There was a discrepancy in original text. …End of the preview. Use “Show the full description” above to read all of it.
1 - SF 1449 is amended as follows:
a) Block 20 - "30 days" is changed to "60 days"
b) Block 28 is checked, quoter to sign and return 1 copy; quoters must sign block 30 and return to the CO
c) Block 27a - FAR52.212-3 and FAR 52.212-5 were rescinded with the FAR Overhaul and are not applicable to this solicitation.
2 Section B.1 Invoices Paragraph 3(c) is changed to read: Other [X] After Acceptance.
3 Additional Requirements (page 7) is replaced as follows (affected words underlined).
The product manufacturer s date cannot exceed 24 months (2 years) before the purchase order award date. The equipment must be unused and not refurbished, and it shall have the latest software and hardware updates installed by the manufacturer.
Batteries included with the unit must have been manufactured within 6 (six) months of the purchase order award date.
Service Manuals, including the theory of operation, maintenance requirements, repair information, schematics, part lists, and troubleshooting details, will be provided to the VA HTM Department in electronic format within three (3) days of delivery.
Warranty information regarding parts and labor must be provided for all procured products in electronic format. Documentation must be sent to both the IOT&A contractor and the VA HTM Department within three (3) days of delivery.
4 Note on purchase order award date The government anticipates making the purchase order award in early December 2026.
5 Confidentiality and Non-Disclosure There was a discrepancy in original text. This amendment confirms that a Security Accreditation Package is not required.
6 Delivery Schedule - In the unlikely event of VA activation team delay that would impact the delivery schedule, the VA will provide 30-days notice of such delay.
7 - VAAR 852.219-77 and 852.219-78 do not apply to this solicitation since a subcontracting plan is not required.
8 - Regarding VAAR 852.239-75, Section 508 documentation is not required for this solicitation.
8 VAAR 852.247-74 is modified to read shipping line items 0001 and 0002 There are no other changes to this clause.
** End of Amendment 0001 to Solicitation 36C25027Q0037 **
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Nov 13, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 13, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Published by the agency on SAM.gov as notice b7a0e388a80443e3b7500277649a6f94. What these dates mean