Skip to main content

← Back to results

DEPT OF DEFENSE › DEPT OF THE NAVY › NAVSUP › NAVSUP GLOBAL LOGISTICS SUPPORT › NAVSUP FLC BAHRAIN

USS LEWIS B PULLER -MTA -FY 27.

Key facts

Response deadline
Sep 30, 2027
10:00 AM UTC+03:00
Set-aside
Not stated
Notice type
Presolicitation
Posted on SAM.gov
Sep 21, 2026
Archives Oct 15, 2027

Description

Mid-Term Availability (MTA) package for the USS LEWIS B PULLER for the Military Sealift Command (MSC). The package consists of ninety (120) work items (WI), including one (1) optional work item and seven (7) not separately priced (NSP) work items. The ship required Pire-side docking at the contractor’s facility . Technical drawings and specifications will be provided upon request after the solicitation has been issued. The work will be performed at the contractor’s facility located within Seventh Fleet AOR. The anticipated Period of Performance (POP) is from 1 June -16 July 2027.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

No attachment links are available here.

Record dates

Posted on SAM.gov: Sep 21, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice b3f83c4783c74f0db629e463dc6e292a. What these dates mean

Record

Solicitation number
N4033926RF508PSL
Search the index for this number
NAICS
336611 · Ship Building and Repairing
Product/service code
J998 · NON-NUCLEAR SHIP REPAIR (EAST)
Contracting office
FPO, AE 09834-0001
SAM.gov notice ID
b3f83c4783c74f0db629e463dc6e292a