Skip to main content

← Back to results

DEPT OF DEFENSE › DEPT OF THE AIR FORCE › AIR FORCE MATERIEL COMMAND › AIR FORCE SUSTAINMENT CENTER › FA8538 AFSC PZAAB

C-5 Fire Suppression System Repair

Key facts

Response deadline
Nov 27, 2026
5:00 AM UTC-05:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Presolicitation
Posted on SAM.gov
Nov 18, 2026
Archives Dec 12, 2026

Description

Show the full description
C-5 Fire Suppression System This requirement is for depot-level repair for the nine competitive C-5 items listed below. The depot-level repair to be performed includes tear-down, evaluation, repair, testing, component procurement, packaging, handling, storage, transportation, as well as data collection. These services will provide assets to support all the C-5 aircraft until expected retirement of 2040. The assets provided by these services will be used to reduce current back orders and meet quarterly demand rates in support of Air Force sorties and aircraft Programmed Depot Maintenance (PDM). The best estimated quantities (BEQs) with estimated cost. Noun National Stock Number (NSN) Part Number 2 - Inch Zone Fire Valve 4810010033512 7720011-106 Isolation Valve 4810010033513 7720012-105 Shutoff Valve 4810010033514 7720013-107 1 ¼ - Inch Zone Fire Valve 4810010046559 7720015-107 Primary Pressure Relief & Overboard Relief Valve 4820001851031 7720125-101 Pressure Limiter Valve 4820001851033 7720142-101 Secondary Pressure Regulator 4820001851037 7720224-101 Fill Coupling Receptacle 4820001867007 7720017-102 Backpressure Relief Valve 4820002700682 7720119-102 The projected period of contract performance for this requirement is five years. Period of performance is comprised of a basic year with 4 one-year ordering periods. Delivery of assets - Repaired assets shall be delivered in accordance with the schedule, as defined by the contract/order.End of the preview. Use “Show the full description” above to read all of it.

C-5 Fire Suppression System

This requirement is for depot-level repair for the nine competitive C-5 items listed below. The depot-level repair to be performed includes tear-down, evaluation, repair, testing, component procurement, packaging, handling, storage, transportation, as well as data collection. These services will provide assets to support all the C-5 aircraft until expected retirement of 2040. The assets provided by these services will be used to reduce current back orders and meet quarterly demand rates in support of Air Force sorties and aircraft Programmed Depot Maintenance (PDM).

The best estimated quantities (BEQs) with estimated cost.

Noun National                                               Stock Number (NSN)                          Part Number

2 - Inch Zone Fire Valve                                4810010033512                                   7720011-106

Isolation Valve                                               4810010033513                                   7720012-105

Shutoff Valve                                                 4810010033514                                    7720013-107

1 ¼ - Inch Zone Fire Valve                           4810010046559                                      7720015-107

Primary Pressure Relief & Overboard Relief Valve  4820001851031                          7720125-101

Pressure Limiter Valve                                 4820001851033                                       7720142-101

Secondary Pressure Regulator                   4820001851037                                        7720224-101

Fill Coupling Receptacle                             4820001867007                                        7720017-102

Backpressure Relief Valve                          4820002700682                                         7720119-102

The projected period of contract performance for this requirement is five years. Period of performance is comprised of a basic year with 4 one-year ordering periods.

Delivery of assets - Repaired assets shall be delivered in accordance with the schedule, as defined by the contract/order. Assets shall be delivered 95% of the time with the remaining 5% being delivered no more than seven (7) calendar days late. If delivery slips more than seven (7) calendar days from contract delivery schedule, the Contractor shall notify the contracting officer to negotiate a revised delivery date. Delivery of assets to fulfill a SURGE or MICAP requirement shall be thirty (30) calendar days after contractor receives notification of a SURGE or MICAP requirement if assets are already on hand at the contractor's facility. If no assets are on hand at the time of notification, delivery shall be thirty (30) calendar days after receipt of asset(s).

Items included in this effort are military unique and the services do not meet the definitions of FAR Part 2 in terms of commercial items or non-developmental items which can be acquired in the commercial market sector using streamlined acquisition procedures under FAR Part 12.

THIS IS NOT AN AWARD

All replies are due by November 27,2026.

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Nov 18, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Nov 18, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 18, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.

Published by the agency on SAM.gov as notice b09df9734ec9405ba6b874b6f9468caf. What these dates mean

Record

Solicitation number
FD206027-00036
Search the index for this number
NAICS
336413 · Other Aircraft Parts and Auxiliary Equipment Manufacturing
Product/service code
1680 · MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
Place of performance
Georgia 31096
Contracting office
ROBINS AFB, GA 31098-1670
SAM.gov notice ID
b09df9734ec9405ba6b874b6f9468caf