DEPT OF DEFENSE › DEPT OF THE AIR FORCE › AIR FORCE MATERIEL COMMAND › AIR FORCE SUSTAINMENT CENTER › FA8137 AFSC PZIOC
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Key facts
- Response deadline
- Oct 28, 2026
- 1:00 PM UTC-05:00
- Set-aside
- SBPSmall business (partial)
- Small Business Set Aside - Partial
- Notice type
- Solicitation
- Posted on SAM.gov
- Oct 22, 2026
- Archives Dec 15, 2027
Description
Show the full descriptionShow less
October 22, 2026
Please see amendment 0006 attached. Complete RFI responses and documents will be posted at a later date.
October 7, 2026
The government is still working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 28 October, 2026, while the government finalizes documents.
September 23, 2026
The government is sitll working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 13 October, 2026, while the government finalizes documents.
September 16, 2026
Complete RFI responses posted. Followup questions related to these RFIs can be submitted by September 21 at noon CST. The government is not accepting new questions. Any question submitted must be tied to an answer provided in the attachment. The proposal due date will remain unchanged but the government will continue to monitor the need to extend.
September 10, 2026
It was brought to the government's attention that previous solicitation amendments cannot be accessed. They now have been activated and are accessible.
September 3, 2026
Amendment posted with updated Proposal due date, please see attachment. The government is still working to answer all RFIs.
August 25, 2026:
See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry.
August 19 2026:
Please see amendment 0002 attached and an updated Section L.
August 11 2026:
1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026.
2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them.
4 August 2026:
Please see the attached RFP (FA8137-26-R-0040) and all attachments.
---------------------------------------------------------------------------------------------------------------
THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation
Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals.
Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract.
Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government.
Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction.
Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements.
The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents.
The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million.
The MACC will be executed for one base period of five (5) years with one option period of five (5) years.
The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction. The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order.
IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date. Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database.
DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose.
Contacts
Hailie Reyes · primary
David Logue · secondary
Attachments
BidLookup records the links this notice gives. It has not downloaded or checked the files.
- Attachment 1 on SAM.gov
- Attachment 2 on SAM.gov
- Attachment 3 on SAM.gov
- Attachment 4 on SAM.gov
- Attachment 5 on SAM.gov
- Attachment 6 on SAM.gov
- Attachment 7 on SAM.gov
- Attachment 8 on SAM.gov
- Attachment 9 on SAM.gov
- Attachment 10 on SAM.gov
- Attachment 11 on SAM.gov
- Attachment 12 on SAM.gov
- Attachment 13 on SAM.gov
- Attachment 14 on SAM.gov
- Attachment 15 on SAM.gov
- Attachment 16 on SAM.gov
- Attachment 17 on SAM.gov
- Attachment 18 on SAM.gov
- Attachment 19 on SAM.gov
- Attachment 20 on SAM.gov
- Attachment 21 on SAM.gov
- Attachment 22 on SAM.gov
- Attachment 23 on SAM.gov
- Attachment 24 on SAM.gov
- Attachment 25 on SAM.gov
- Attachment 26 on SAM.gov
- Attachment 27 on SAM.gov
- Attachment 28 on SAM.gov
- Attachment 29 on SAM.gov
- Attachment 30 on SAM.gov
- Attachment 31 on SAM.gov
- Attachment 32 on SAM.gov
- Attachment 33 on SAM.gov
- Attachment 34 on SAM.gov
- Attachment 35 on SAM.gov
- Attachment 36 on SAM.gov
- Attachment 37 on SAM.gov
- Attachment 38 on SAM.gov
- Attachment 39 on SAM.gov
- Attachment 40 on SAM.gov
- Attachment 41 on SAM.gov
- Attachment 42 on SAM.gov
- Attachment 43 on SAM.gov
- Attachment 44 on SAM.gov
- Attachment 45 on SAM.gov
Record dates
- Posted on SAM.gov: Oct 22, 2026
- The agency’s publication date, as SAM.gov states it.
- First recorded by BidLookup: Oct 22, 2026
- The UTC day of the first read of SAM.gov’s listings that stored this notice.
- Last confirmed: Oct 24, 2026
- The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Published by the agency on SAM.gov as notice afa7d6c684484055a4e0991d3d855a08. What these dates mean
Record
- Solicitation number
- FA8137-26-R-0040
- Search the index for this number
- NAICS
- 236210 · Industrial Building Construction
- Product/service code
- Z2JZ · REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
- Place of performance
- 0, Oklahoma 73145
- Contracting office
- TINKER AFB, OK 73145-9125
- SAM.gov notice ID
- afa7d6c684484055a4e0991d3d855a08