DEPT OF DEFENSE › DEPT OF THE ARMY › AMC › ACC › MISSION INSTALLATION CONTRACTING COMMAND › 419TH CSB › W6QM MICC-FT DRUM
Thermal Arc Sound Attenuation Booth
Key facts
Response deadline
Oct 13, 2026
12:00 PM UTC-05:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Combined synopsis/solicitation
Posted on SAM.gov
Oct 5, 2026
Archives Oct 5, 2027
Description
Amendment 0001 CLIN Correction. Thermal Arc Booth Salient Characteristics MCAAP Engineering will verify and validate the proposal from the vendor prior to award.Scope: Thermal Arc Sound Attenuation Booth. Includes all necessary parts and hardware for a completely erected (in 2 halves) Thermal Arc Booth.Item/Model #: QT100118128TA or similar. 1 EAProduct Description:77.5-inch x 102.5-inch x 116-inch Booth.Includes all necessary parts and hardware for a completely erected (in 2 halves) Thermal Arc Booth.18ga galvanized flat panel construction with single slope style roof. Rockwool insulation enclosed in between the 3-inch-deep exterior wall panel and the galvanized, perforated interior liner. Unit is to be assembled and shipped with doors loose. Door hardware and switches included.All onsite installation, mounting, etc. are by others. All auxiliary components (exhaust fan, lights, switches, etc.) are supplied and installed by others.Model: Qualitech thermal arc sound attenuation booth model QT77102116TA or similar. 1 EA.Product Description:100-inch x 118.5-inch x 128-inch Booth.Includes all necessary parts and hardware for a completely erected (in 2 halves) Thermal Arc Booth.18ga galvanized flat panel construction with single slope style roof. Rockwool insulation enclosed in between the 3-inch-deep exterior wall panel and the galvanized, perforated interior liner. Unit is to be assembled and shipped with doors loose. All onsite installation, mounting, etc. are by others.
Show moreShow less
All auxiliary components (exhaust fan, lights, switches, etc.) are supplied and installed by others.Thermal Arc Booth Dimensional specs:102.5-inch overall outer dimension entrance to exit face.86.5-inch overall outer dimension of booth depth.36.5-inch outer dimension of front booth section depth.20-inch outer dimension of back booth section depth including the welding arm offset.44-inch outer dimension wide by 9-inch outer dimension deep welding arm offset centered on the back booth section with a 114-inch tall and 26-inches wide cut out.30-inch door gap between the front and back booth sections.10-inch gap on the top between the front and back booth sections for monorail fed items.120-inch minimum interior height.3-inch-deep exterior wall panels.18-inch x 18-inch hole for duct transition piece located on the front booth section above the internal plenum.Features: Internally mounted entrance door that swings towards the front.Externally mounted exit door that swings towards the front.Door hardware and switches including cylinders and controls.Internal plenum in the front booth section for ventilation.Welding arms offset and cut out.18ga galvanized flat panel construction with single slope style roof.Rockwool insulation.Galvanized perforated interior liner. Mounting plates for floor anchoring.Anchoring hardware. Internal bracing.MCAAP to provide: Building air. Installation. Auxiliary components.DETAILED DESCRIPTION REQUIRED PRIOR TO AWARD: The MCAAP Engineering Support Division will validate and verify/approve the contractor listed equipment concept before award is granted. In order to meet this review requirement, the offeror shall submit with their proposal a detailed technical description of the thermal arc booth. The offerors description submittal shall account for each one of the required product features located in this qualifying statement. Conceptual drawings that are not detail as built drawings are required for submittal with the detailed description.Approval drawing(s) is/are requested. 3D models requested can be in native SolidWorks format, IGES, and/or STEP within two weeks after award.
From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 6, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.
Published by the agency on SAM.gov as notice ae3592d60d574d3ab10379f8b3fb2a97. What these dates mean