DEPT OF DEFENSE › DEPT OF THE ARMY › AMC › ACC › MISSION INSTALLATION CONTRACTING COMMAND › 419TH CSB › W6QM MICC-FT DRUM
WELDER PACKAGE
Key facts
Response deadline
Jan 22, 2026
8:00 AM UTC-05:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Combined synopsis/solicitation
Posted on SAM.gov
Jan 15, 2026
Archives Jan 15, 2027
Description
MIG WELDER PACKAGE 3) General RequirementsThis section provides the specification requirements for the Welding Machine Package. Note: Every item listed in this section shall be accounted for in the offeror?s proposal for it to be considered (see section 6.).a) System shall meet all applicable OSHA standards and regulations.b) Vendor Shall ensure All Components of the system are compatible. c) Power supply shall have a minimum duty cycle of 100% at 36volts/400 amps.d) Machine Shall be compatible with 480-volt 3 phase power.e) System Shall be able to do the following processes,1. Shielded Metal Arc Welding (SMAW)2. Direct Current Gas Tungsten Arc Welding (DC GTAW)a. High Frequency Startb. Lift Arc3. Gas Metal Arc Welding (GMAW)4. Pulse Gas Metal Arc Welding (GMAW-P)5. Flux Core Arc Welding (FCAW)f) The wire feeder shall be a dual wire setup.1. The Wire feeder shall have a minimum duty cycle of 100% at 100 volts/600 amps.2. The Wire feeder Shall include spool covers for 33lb wire spools.3. The Wire feeder Shall include 2, 15ft (min) 300amp Mig gun assemblies.4. The Wire feeder Shall be compatible with ?Miller style? power pins on the Mig gun assemblies.5. Wire feeder control cable and weld power cable Shall be included.6. 25 ft work sense lead shall be included.7. Vendor Shall include Feeder drive roll kits of the following sizes (Dual size reversable are acceptable).a. .035 V-Grooveb. .045 V-Groovec. .062 V-Groove8. Vendor Shall include Wire Guides of the following sizes.a. .035b. .045c.
Show moreShow less
.062g) System Shall include a wireless remote foot controller.1. Wireless foot control Shall accept ?AA? size batteries.2. Vendor Shall provide batteries to fill the controller not less than 2 times.h) System Shall include a heavy-duty foot control pedal with 20ft of cord.i) System Shall Include 2 Sheild Gas Flow meter regulators.j) System Shall include 2 gas hoses (4ft min).k) Machine must include a cooler.1. Cooler must be removeable for service/repair.l) Machine must have dedicated Tig Torch Connection.m) Machine must have dedicated Tig Gas hose Connection.n) Machine must have dedicated Tig Remote Connection.o) Machine must have dedicated Stick Connection.p) Machine must have dedicated Work cable Connection.q) Running Gear/Cart Shall be included.1. 2 brackets to stow the foot controls Shall be included.r) 25 ft(min) Work Lead Shall be included.
From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.
Published by the agency on SAM.gov as notice ac2bc343dcf944438c6387f161697f7e. What these dates mean