Skip to main content

← All opportunities

HOMELAND SECURITY, DEPARTMENT OF › US COAST GUARD › SFLC PROCUREMENT BRANCH 2(00085)

USCGC Healy Relief Valves Overhaul

Key facts

Response deadline
Sep 28, 2026
8:00 AM UTC-07:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Combined synopsis/solicitation
Posted on SAM.gov
Sep 23, 2026
Archives Oct 13, 2026

Description

STATEMENT OF WORK (SOW) Vessel: USCGC HEALY (WAGB 20) Project: Relief Valves Overhaul 1.0 SCOPE Requirements for the inspection, overhaul, and testing of two (2) relief valves, Part Number: S8LJE-02RF1-03RF1-SS-H2-TB, belonging to the United States Coast Guard Cutter (USCGC) HEALY, homeported in Seattle, WA. Location: Contractor’s Facility. 2.0 BACKGROUND USCGC HEALY requires routine periodic maintenance and overhaul of mechanical systems to ensure operational readiness and safety. The specified relief valve requires a full overhaul, including the replacement of all soft goods, reassembly, and testing to restore it to Original Equipment Manufacturer (OEM) specifications. 3.0 REFERENCES The Contractor shall adhere to the following references during the performance of this work: 3.1 Original Equipment Manufacturer (OEM) Technical Manuals and specifications for PN: S8LJE-02RF1-03RF1-SS-H2-TB. 3.2 U.S. Coast Guard Standard Specification (CG-47) - General Requirements for Ship Repair. 4.0 TECHNICAL REQUIREMENTS CLIN 001 The Contractor shall provide all labor, materials, equipment, and facilities necessary to perform the following: 4.1 Disassembly and Cleaning ? Carefully disassemble the relief valve in accordance with OEM guidelines. ? Thoroughly clean all internal and external components to remove scale, debris, and marine growth without damaging the base metal or seating surfaces. ?4.2 Inspection ? Perform a visual and dimensional inspection of all hard parts (body, spring, stem, disc, nozzle, etc.). ?
Show more
Identify any wear, pitting, scoring, or damage that exceeds OEM tolerances. ? Deliverable: Submit a Condition Found Report (CFR) to the Coast Guard Technical Point of Contact (TPOC) detailing the inspection results and recommending any additional repairs or replacement of hard parts prior to proceeding. 4.3 Overhaul and Reassembly ? Upon approval of the CFR, replace all soft goods (including O-rings, gaskets, packing, and seals) using 100% genuine OEM replacement parts. ? Machine or lap seating surfaces as necessary to achieve a proper seal, strictly within OEM tolerances. ? Reassemble the valve in accordance with OEM specifications, applying the correct torque values to all fasteners. 4.4 Testing and Calibration ? Perform hydrostatic shell testing and seat leakage testing in accordance with applicable OEM and industry standards. ? Set, calibrate, and pop-test the relief valve to the designated set pressure required by the ship's system parameters. ? A?ix a new metallic calibration tag to the valve indicating the set pressure, test date, and contractor identification. ? Deliverable: Provide a certified Test Report documenting the set pressure, pop pressure, reseat pressure, and confirmation of zero leakage. 5.0 GOVERNMENT FURNISHED PROPERTY (GFP) The Coast Guard will provide the following: ? Two (2) Relief Valve, PN: S8LJE-02RF1-03RF1-SS-H2-TB. USCG will ship valves to the contractor. Contractor is responsible for shipment of valves to USCG Base Seattle via two-day delivery methods. 6.0 Period of Performance: within 15 days from the award. 6.1 CLIN 0002: Potential Repairs based on CFR not to exceed ($1,500 dollars) 6.2. Pricing for any additional travel costs, material, or field service days will be requested and handled by the KO under the terms of the contract. Any repairs beyond the base scope identified because of the troubleshooting shall be documented in a Condition Found Report (CFR) with a technical description of the recommended repairs. The CFR shall be provided to the Technical POCs and the Contracting O?icer. 6.3. Any additional work will be authorized only by the KO through a written contract modification. The contractor shall not perform any repairs beyond the base scope until specifically authorized in writing by the KO. If the Government elects to proceed with additional repairs, the KO will issue a written contract modification that identifies the authorized additional work and associated firm fixed price. The contractor shall base any proposal for additional repairs on the findings in the CFR. For questions regarding this SOW contact: MKCM Armando Perez @ [email protected]

From SAM.gov’s daily data file, as published on Oct 9, 2026 (UTC). SAM.gov’s latest daily file no longer lists this notice.

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Sep 23, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 8, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 9, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice a7ec908e302b4ed7aab4fddc43f167e5. What these dates mean

Record

Solicitation number
70Z08526Q0028500
Search the index for this number
NAICS
336611 · Ship Building and Repairing
Product/service code
J020 · MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
Place of performance
Seattle, Washington 98134
Contracting office
ALAMEDA, CA 94501
SAM.gov notice ID