Description

This is a pre-solicitation synopsis for a competitive solicitation that GPO intends to post on SAM.gov on or about May 11, 2026. The scope of work includes: The concrete sidewalk and the vault structure beneath the G Street Sidewalk are showing signs of moderate to severe deterioration of the concrete and the encased structural framing. Over time and a failure of the waterproofing membrane, salt water, and other liquids constantly migrate into the reinforced slab and cause deterioration substantial damages. The contractor shall provide the labor, material, equipment, and supervision to demolish and install the sidewalk slab and to repair and renovate the vaults beams, concrete slab, waterproofing membrane, and columns and other related structures to eliminate the water migration into the basement. All the work shall be in accordance with the design drawings and specifications prepared and submitted along with this statement of work. The contractor is required to obtain permits, traffic control plans, safety, and security approval prior to construction starting. The contractor shall complete the following tasks as part of the project at the GPO G Street Sidewalk Repair: Pre-Construction Tasks Obtain all required permits and approvals. Submit project schedule, safety plan, and traffic control plan. Coordinate with GPO project management and stakeholders. Conduct pre-construction meetings and site walkthrough. Site Preparation & Demolition Install temporary barriers, signage, and traffic control measures.
Show more
Set up designated staging and material storage areas. Perform selective demolition of existing structures as required. Ensure safe removal and disposal of construction debris. Material Delivery & Logistics Coordinate material deliveries in compliance with schedule. Inspect and verify all materials upon arrival. Store materials in designated secure areas. Construction & Installation Perform site grading and preparation, if applicable. Install structural components, framing, and support systems. Complete mechanical, electrical, and plumbing (MEP) installations. Install architectural finishes, including flooring, ceilings, and walls. Implement weatherproofing and insulation systems as required. Conduct equipment and systems testing to ensure functionality. Safety & Compliance Maintain compliance with OSHA and other regulatory standards. Implement and monitor safety protocols for workers and pedestrians. Address any environmental concerns, including hazardous material handling. Quality Control & Inspections Conduct periodic quality control checks. Submit required inspection and testing reports. Address any deficiencies noted in inspections. Project Closeout Complete all final construction activities and finishing work. Conduct a final walkthrough with the GPO project team. Prepare and submit as-built drawings and O&M manuals. Resolve punch list items and obtain final acceptance. Restore site and remove temporary facilities. Submit final project documentation, including warranties and certifications Period of Performace is eighteen (18) months from Notice to Proceed. A site visit will be scheduled and listed in the solicitation.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Apr 29, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice a6f3646f86b74f1889aafa0834d817cc. What these dates mean

Record

Solicitation number
040ADV-26-R-0010
Search the index for this number
NAICS
238190 · Other Foundation, Structure, and Building Exterior Contractors
Product/service code
Z1AZ · MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Place of performance
District of Columbia 20401
Contracting office
Washington, DC 20401
SAM.gov notice ID
a6f3646f86b74f1889aafa0834d817cc