VETERANS AFFAIRS, DEPARTMENT OF › NETWORK CONTRACT OFFICE 23 (36C263)
437-22-108 Place Chilled Water Pumps on Epower
Key facts
- Response deadline
- Feb 6, 2026
- 2:00 PM UTC-06:00
- Set-aside
- SDVOSBSService-disabled veteran-owned, sole source
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source (FAR 19.14)
- Notice type
- Presolicitation
- Posted on SAM.gov
- Jan 20, 2026
- Archives Dec 31, 2026
Description
Work shall include, but shall not be limited to providing all abor, materials, equipment, etc necessary to complete Fargo VA Health Care System project 437- 22-108, Place Chilled Water Pumps on Emergency Power, in accordance with this Scope of Work, NEC, VHA Directive 1028 (Electrical Power Distribution Systems), the contract documents, all applicable federal, state and local codes as well as all NFPA requirements. Work shall include, but shall not be limited to, installation and commissioning of anew automatic transfer switch for the five (5) 40 hp chilled water pumps (CHWP#1-5) in BE-27 mechanical room to maintain an emergency equipment branchpower path (from panel in ) and a normal branch power path (from panel in), aswell as breaker location switching and replacement for pumps 8, 9, 12, 13, 14,15, 16, 17, 18, and 19, with Motor Control Center (MCC) bucket swapping and relocation for pumps 8 and 9, with all necessary conduit and wire demolition, intercepting, rerouting, and installation to bring them onto emergency equipment branch power. Some pieces of electrical distribution equipment will require commissioning services to be obtained by the Contractor and include at a minimum, the automatic transfer switch. The Contractor shall account for and be prepared to replace all necessary devices, cabling, and conduit as needed and per specifications. As part of commissioning, the Contractor shall be responsible for testing all equipment installed per NEC, and the best practices and standards issued by the National Electrical Testing Association (NETA), and the Institute of Electrical and Electronics Engineers (IEEE). Period of Performance =270 calendar Days
From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).
Contacts
Dwayne Brauch · primary
Attachments
BidLookup records the links this notice gives. It has not downloaded or checked the files.
Record dates
- Posted on SAM.gov: Jan 20, 2026
- The agency’s publication date, as SAM.gov states it.
- First recorded by BidLookup: Oct 8, 2026
- The UTC day of the first read of SAM.gov’s listings that stored this notice.
- Last confirmed: Oct 23, 2026
- The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
- Description as published: Oct 24, 2026 (UTC)
- The date of the daily data file this text came from.
Published by the agency on SAM.gov as notice 9c456b31d0a04a9ba952189a322c5d0a. What these dates mean
Record
- Solicitation number
- 36C26326B0013
- Search the index for this number
- NAICS
- 236220 · Commercial and Institutional Building Construction
- Product/service code
- Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES
- Place of performance
- Fargo, North Dakota 58102
- Contracting office
- Saint Paul, MN 55101
- SAM.gov notice ID
- 9c456b31d0a04a9ba952189a322c5d0a