Skip to main content

← Back to results

HOMELAND SECURITY, DEPARTMENT OF › US COAST GUARD › CG-SEA-C22

USCGC HEALY Integrated Power Plant Support Services Contract Fiscal Year 2028-2033

Key facts

Response deadline
Nov 29, 2026
5:00 PM UTC-08:00
Set-aside
Not stated
Notice type
Sources sought
Posted on SAM.gov
Nov 13, 2026
Archives Dec 14, 2026

Description

Show the full description
This announcement is a Sources Sought Synopsis (market survey). This is not a Request for Quote (RFQ) or a Request for Proposal (RFP). This announcement is for information and planning purposes only and is not a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The purpose of this sources sought is to determine interest and capability of potential businesses. The Government may use responses to this sources sought synopsis to make an appropriate acquisition decision for this project. The U.S. Coast Guard Surface Forces Logistics Center is conducting market research for potential qualified contractors for the maintenance and support of the systems and equipment pertaining to the Integrated Propulsion Plant on Coast Guard Cutter (CGC) HEALY from 20JULY2028 – 21JULY2033. GE Power, Power Conversion a Part of GE Vernova (GE) is the original equipment manufacturer (OEM) of the Integrated Propulsion Plant on CGC HEALY and holds the proprietary data rights to provide the required repair and support. The previous contract was awarded sole source to GE under contract number 70Z08523DLREP0003. This work requires that the Contractor provide all management, supervision, personnel, labor, materials and equipment (except for Government furnished property) required to maintain and support the integrated machinery plant systems/components on CGC HEALY and Government owned shoreside equipment that is used in support of CGC HEALY.End of the preview. Use “Show the full description” above to read all of it.

This announcement is a Sources Sought Synopsis (market survey). This is not a Request for Quote (RFQ) or a Request for Proposal (RFP). This announcement is for information and planning purposes only and is not a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The purpose of this sources sought is to determine interest and capability of potential businesses. The Government may use responses to this sources sought synopsis to make an appropriate acquisition decision for this project.

The U.S. Coast Guard Surface Forces Logistics Center is conducting market research for potential qualified contractors for the maintenance and support of the systems and equipment pertaining to the Integrated Propulsion Plant on Coast Guard Cutter (CGC) HEALY from 20JULY2028 – 21JULY2033.

GE Power, Power Conversion a Part of GE Vernova (GE) is the original equipment manufacturer (OEM) of the Integrated Propulsion Plant on CGC HEALY and holds the proprietary data rights to provide the required repair and support. The previous contract was awarded sole source to GE under contract number 70Z08523DLREP0003.

This work requires that the Contractor provide all management, supervision, personnel, labor, materials and equipment (except for Government furnished property) required to maintain and support the integrated machinery plant systems/components on CGC HEALY and Government owned shoreside equipment that is used in support of CGC HEALY.  Support includes, but is not limited to, periodic equipment maintenance, technical representative visits, telephone consultations, remote technical support, hardware and software configuration management services, conditional technical support, upgrades, and periodic equipment training. A draft of the current awarded performance work statement is provided for information only.

This work includes, but is not limited to, the following:

  • Periodic system maintenance and equipment grooms. This includes annual shipboard depot level maintenance and shoreside spare depot level maintenance at CG Inventory Control Point (ICPs) and Contractor’s facilities, inspection, and operational testing of all systems and equipment related to the Integrated Power Plant.
  • Technical Support. This includes immediate access to 24/7 technical support while the Cutter is underway and during port calls while on mission.
  • Conditional technical support for troubleshooting and repairs. This includes casualty response and repairs, as well as engineering analysis and repairs identified as necessary during equipment grooms.
  • Configuration management services. This includes obsolescence evaluation and prediction of out-year reliability, maintainability, and fitness of service availability concerns five years beyond the contract.
  • Crew training. This includes hands-on and classroom training for operators and maintainers both attached to HEALY as permanent party crew and CG shore support personnel.
  • Technical refresh and replacement of obsolete subcomponents to meet current industry supportability standards. This includes design, validation, and installation of specific system subcomponents to ensure operational availability and maintenance support through the midlife maintenance period.

The CGC HEALY is homeported in Seattle, WA at 1519 Alaskan Way S., Seattle, WA 98134. The CGC HEALY, the Coast Guard's largest vessel, is 420 feet long, 82 feet wide, drafts 31 feet (at full load), and weighs 16,660 long tons (at full load).

NAICS Code for this requirement: 336611 – Ship Building and Repairing
FSC Code for this requirement:  J999 – Non-Nuclear Ship Repair (West)
Size Standard: 1,300 Employees

Please note that the period maintenance being performed will occur during planned dry dock and dockside availabilities, at which time other substantial depot-level maintenance will be accomplished.

No cost or pricing data is required.  All responsible sources may submit a capability statement, which will be considered by the agency. If interested and capable of performing the work please respond to the attached questionnaire returning it via email to Contract Specialist Sherri Ore at [email protected] and Contracting Officer, Amy Kelm, at [email protected]. Please insert - Sources Sought Response to 70ZU027ILREP1113 in the subject line.

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Nov 13, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Nov 13, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 14, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.

Published by the agency on SAM.gov as notice 941a6f175e884d16a8cda28c7b683a79. What these dates mean

Record

Solicitation number
70ZU027ILREP1113
Search the index for this number
NAICS
336611 · Ship Building and Repairing
Product/service code
J999 · NON-NUCLEAR SHIP REPAIR (WEST)
Place of performance
Seattle, Washington 98134
Contracting office
Alameda, CA 94501
SAM.gov notice ID
941a6f175e884d16a8cda28c7b683a79