Skip to main content

← All opportunities

VETERANS AFFAIRS, DEPARTMENT OF › 261-NETWORK CONTRACT OFFICE 21 (36C261)

6150--FY26 NRM 654-26-020 | 654-26-2-6059-0042 | Bldg 12 Pump Power Relocation | VA Sierra Nevada Health Care System Reno, NV

Key facts

Response deadline
Aug 14, 2026
12:00 PM UTC-07:00
Set-aside
Not stated
Notice type
Solicitation (originally Presolicitation)
Posted on SAM.gov
Jul 16, 2026
Archives Oct 13, 2026

Description

Title: NRM 654-26-020 - Building 12 Pump Power Relocation Description: The Department of Veterans Affairs, Network Contracting Office (NCO) 21, has a requirement for a contractor to provide all personnel, equipment, tools, materials, and supervision necessary to relocate and add additional power legs to the water pumps in the Building 12 basement. Scope of Work: The Contractor shall install emergency power, relocate the normal power onto the existing motor control center (MCC), and install a new manual transfer switch (MTS) to correct existing system deficiencies where pumps currently have no emergency power source. The Contractor must conduct a thorough review of the work area and existing equipment to identify potential pathways and determine the most feasible course of action for installation. Key Requirements: Compliance & Safety: The new normal and emergency electrical systems must be fully compliant with the VA Technical Information Library (TIL), the Veterans Health Administration (VHA) Electrical Design Manual, and all up-to-date safety codes. The contractor must also strictly follow OSHA safety and Lock-Out-Tag-Out (LOTO) procedures. Working Hours & Outages: Standard work hours shall be Monday through Friday, 0700 to 1700, excluding federal holidays. The contractor must give the Contracting Officer's Representative (COR) advanced notice before executing any facility outages. Schedule & Milestones:
Show more
The contractor must submit a schedule detailing materials, labor, and construction milestones within the first two weeks of the project start date. The entire project must be completed within 180 calendar days after the issuance of the Notice to Proceed (NTP). Certifications: The General Contractor s Competent Person/Superintendent must hold a 30-hour OSHA construction safety certification, and all on-site employees (including subcontractors) must hold a 10-hour OSHA certification. Insurance & Warranty: The contractor must submit documentation from their insurance carrier verifying an Experience Modification Rate (EMR) equal to or less than 1.0. A standard one-year warranty on all materials and workmanship is required. Place of Performance: Services are required at the following location: VA Sierra Nevada Health Care System, 975 Kirman Avenue, Reno, NV 89502-2597. Contract Type: Firm-Fixed-Price Construction Contract, 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.

From SAM.gov’s daily data file, as published on Oct 9, 2026 (UTC). SAM.gov’s latest daily file no longer lists this notice.

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Jul 16, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 8, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 9, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 8ec08495bcc049d2992cde9d15fd1c9b. What these dates mean

Record

Solicitation number
36C26126R0050
Search the index for this number
NAICS
238210 · Electrical Contractors and Other Wiring Installation Contractors
Product/service code
6150 · MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT
Contracting office
MATHER, CA 95655
SAM.gov notice ID
8ec08495bcc049d2992cde9d15fd1c9b