Skip to main content

← All opportunities

DEPT OF DEFENSE › DEPT OF THE ARMY › US ARMY CORPS OF ENGINEERS › ENGINEER DIVISION SOUTH ATLANTIC › ENDIST CHARLESTON › W074 ENDIST CHARLESTON

FY26 Medical University of South Carolina (MUSC) Pump Upfit

Key facts

Response deadline
Sep 11, 2026
11:00 AM UTC-04:00
Set-aside
Not stated
Notice type
Solicitation
Posted on SAM.gov
Sep 4, 2026
Archives Sep 4, 2027

Description

FY26 Medical University of South Carolina (MUSC) Stormwater Pump Station - DESCRIPTION OF WORK: The Medical University of South Carolina (MUSC) stormwater pump station (PS), located in the Medical District on the Charleston Peninsula, is critical infrastructure for the City of Charleston (City). The MUSC drainage basin forms a topographic low point without a natural outlet, and the PS is required to facilitate drainage. Proposed improvements include: increased pumping capacity including both pump and discharge piping capacity; improved hydraulic configuration in the wet well and inflow chamber; enclosure and conditioning of the control room; elevating all critical electrical and HVAC equipment above the design flood elevation; replacement and upgrade of electrical, instrumentation and controls, security, and lighting; construction of a new transformer pad and installation of increased capacity transformer; replacement of both wet well inflow pipes to correct pipe slope; structural supports of pipes and transformer pad; construction of a permanent bypass connection; replacement of the chain link gate; and minor grading and landscaping around the perimeter slab. The project also includes temporary pumps and piping to maintain station operations during construction. MAGNITUDE OF WORK is estimated at: $5,000,000 TO $10,000,000 North American Industry Classification System (NAICS) Code: 237110, Water and Sewer Line Related THIS ACQUISITION IS UNRESTRICTED. This solicitation is hereby posted as of 7 August 2026.
Show more
Amendment 0002 - Extension of proposal due date to 11 September 2026 and is hereby posted as of 20 August 2026.This admin update is just to correct the date and time in PIEE. Amendment 0004 is posted to provide Site Visit Sign-in Sheet and updated Specs and Drawings see Addendum 01, this Amendment is hereby post as of 4 September 2026.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

No attachment links are available here.

Record dates

Posted on SAM.gov: Sep 4, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 825a5ce7373343ad9f45bdc4e3a30f2d. What these dates mean

Record

Solicitation number
W912HP26RA026
Search the index for this number
NAICS
237110 · Water and Sewer Line and Related Structures Construction
Product/service code
Y1NE · CONSTRUCTION OF WATER SUPPLY FACILITIES
Place of performance
29403
Contracting office
CHARLESTON, SC 29403-5107
SAM.gov notice ID
825a5ce7373343ad9f45bdc4e3a30f2d