155mm Modular Artillery for Combat Effectiveness (MACE)

Key facts

Response deadline
Nov 30, 2026
3:00 PM UTC-05:00
Set-aside
Not stated
Notice type
Solicitation
Posted on SAM.gov
Nov 9, 2026
Archives Nov 9, 2027

Description

Amendment 0009 - The purpose of this Amendment 0009 is to incorporate the updated questions and answers attachment, formally revise the proposal submission portal instructions in the Prototype Project Opportunity Notice (PPON) and to add Attachment 34. Specifically, this amendment: Formally Incorporates Updated Attachments and a new attachment: The following attachments are incorporated into the solicitation and replace all previous versions: Attachment 33 Updated MACE Questions Addressed (Dated 11-5), incorporating Questions #24 through #31 (including key clarifications regarding propellant GFE, NRE milestone formatting, and payload canister compatibility). Please note Attachment 33 has been uploaded as Controlled attachment. Attachment 34 12961016 Rotating Cover Band has been uploaded as Controlled attachment in response to question #28. PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 11-5) has been revised to incorporate the updated attachment list in Section 11. Amends the PPON Submission instructions: The PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated11-5) has been revised in Section 3.1.13 to formally correct the submission portal from SAM.gov to Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module: Revised Text:
Show more
3.1.13 All proposal submissions shall be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module (https://piee.eb.mil) .The direct solicitation link may be accessed via the active solicitation notice on SAM.gov. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 5, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. **************************************************************************************************************************************End of Narrative 0009***********************************************************************************************************************************************************************************************************************************************Amendment 0008 - The purpose of this Amendment 0008 is to incorporate updated questions and answers, and issue revised solicitation attachments. Specifically, this amendment: Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 30 Updated MACE Offeror Questions Addressed (Dated 10-29), incorporating Questions #20 through #23.Attachment 31 Updated MACE CLIN Matrix (Dated 10-29), to clarify that the due dates for CLINs 0001A and 0014A represent the initiation of NRE activities, and that payment may be earned across interim milestones per Question #23.Attachment 32 Updated Statement of Work (SOW) (Dated 10-29), removing the administrative reference to Attachment B in SOW Section 8.0 per Question #21.Amends the PPON Text: The Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 10-29) has been revised in Section 3.3.3 (Volume III, Cost/Price) to add the following language to the third paragraph: to include the interim milestone allocations for Non-Recurring Engineering (NRE) under CLIN 0001A and CLIN 0014A. The attachment list has been updated to incorporate the revised attachments. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes.*******************************************************************************************************************************************************************************************************************************************End of Narrative 008 *****************************************************************************************************************************************************************************************************************************************************Amendment 0007 - The purpose of this Amendment 0007 is to extend the solicitation response deadline, incorporate updated questions and answers, and issue revised solicitation attachments. Specifically, this amendment: Extends the Proposal Submission Deadline: The solicitation response deadline is extended from October 30, 2026, to 1500 EST on November 30, 2026. This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals that deliver the best value to the Government. As a result, the Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN26R1C5R Dated 10-27) has been revised to reflect the new response deadline and the updated attachments list. Incorporates Updated Attachments: The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 27 Updated MACE Offeror Questions Addressed (Dated 10-26), incorporating Questions #17 through #19.Attachment 28 Updated Statement of Work (SOW) (Dated 10-26), reflecting the revised anticipated award date of March 29, 2027, while maintaining relative milestone durations. Attachment 29 Updated MACE CLIN Matrix (Dated 10-26), incorporating dedicated Non-Recurring Engineering (NRE) line items pursuant to Question #17. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. ************************************End of Narrative 0007 *****************************************************************************************************************************************************************************************************************************************************Amendment 0006 - The purpose of amendment 0006 is to update the Question and Answer document from Attachment 23 - Updated MACE Offeror Questions Addressed 10-5 to Attachment 26 - Updated MACE Offeror Questions Addressed 10-15. This amendment also updates the PPON (PPON MACE Extended Updated Attachments (Updated 10-15)) to add Attachment 26 to the attachment list.*********************End of Amendment 0006***********************************************************************************************************************************************************************************************************************************************Amendment 0005 - The purpose of this Amendment 0005 is to resolve the schedule discrepancies identified in the solicitation and provide the definitive baseline for all proposal submissions. Specifically, this amendment: The Government acknowledges the discrepancy between the delivery dates specified in the original Statement of Work (SOW) (Attachment 7) and the performance periods specified in the original MACE CLIN Matrix (Attachment 4), which was caused by the proposal submission extension in Amendment 0001. This Amendment 0005 provides a revised and corrected Statement of Work (SOW) and CLIN Matrix. All schedule milestones have been aligned to relative durations (Months After Agreement Award) to ensure a stable, executable performance period. Amendment 0005 also adds the Updated MACE Questions Addressed plus an updated PPON which lists the amended attachments. The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 25 Updated Statement of Work (SOW) (Dated 10-6) Attachment 24 Updated MACE CLIN Matrix (Dated 10 6) Attachment 23 Updated MACE Questions Addressed (Dated 10-5) PPON Document MACE Extended Updated Attachments W15QKN 26R1C5R (Dated 10-6) All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents (updated attachments October 5 and 6, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. *********************End of Amendment 0005***********************************************************************************************************************************************************************************************************************************************Amendment 0004 - The purpose of amendment 0004 is to update the Question and Answer document from Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 to Attachment 16 - Updated MACE Offeror Questions Addressed 9-24. Amendment 0004 also serves as notification that 6 additional TDP documents have been uploaded to SAM.gov. Vendors who have already been approved for the TDP can access the documents immediately, and those not previously approved may request access through SAM. **********************************************End of Amendment 0004***********************************************************************************************************************************************************************************************************************************************Amendment 0003 - The purpose of this amendment 0003 is to add Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 **************End of Amendment 0003***********************************************************************************************************************************************************************************************************************************************Amendment 0002 - The purpose of this amendment 0002 is to add Attachment 15 - MACE Offeror Questions Addressed. *********************End of Amendment 0002 Narrative *************************************************************************************************************************************************************************************************************************************** Amendment 0001 - The purpose of this amendment 0001 is to extend the solicitation response deadline from September 30, 2026 to October 30, 2026. This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals which deliver the best value to the Government. As a result of the extension, the Prototype Project Opportunity Notice (PPON) has been revised to reflect the new response deadline. Attachment 1 - Terms and Conditions has been updated in Supplement 5, Sub Section number 2 Outside Funding Contribution Schedule to change the Basic Agreement Years from FY 2026, FY 2027, FY 2028 to FY 2027, FY 2028, FY 2029. ****End of Amendment 0001 Narrative****************************************************************************************************************************** 155mm Modular Artillery for Combat Effectiveness (MACE) - Please refer to Prototype Project Opportunity Notice (PPON) and attachments. Please note: Attachment 8 - Purchase Description and Attachment 9 - Packing and Unitization Drawings will be provided to Offerors upon request once the Offeror signs, completes and submits the following documents for contracting approval: Attachment 12 Technical Data Request Questionnaire; Attachment 6 Non-Disclosure and Non US Agreement plus Attachment 14 DD2345 Military Critical Technical Data Agreement. Please refer to section 8 of the PPON for further information.

From SAM.gov’s daily data file, as published on Nov 10, 2026 (UTC).

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Nov 9, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Nov 9, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 10, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Nov 10, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 7fc6595da5e449a491ac470b3dfb0f22. What these dates mean

Record

Solicitation number
W15QKN26R1C5R
Search the index for this number
NAICS
332993 · Ammunition (except Small Arms) Manufacturing
Product/service code
1320 · AMMUNITION, OVER 125MM
Contracting office
PICATINNY ARSENAL, NJ 07806-5000
SAM.gov notice ID
7fc6595da5e449a491ac470b3dfb0f22