DEPT OF DEFENSE › DEPT OF THE ARMY › US ARMY CORPS OF ENGINEERS › ENGINEER DIVISION SOUTH PACIFIC › ENDIST LOS ANGELES › W075 ENDIST LOS ANGELES
RIO DE FLAG FLOOD CONTROL PROJECT PHASE 4 LOWER RDF INLET
Key facts
- Response deadline
- Sep 18, 2026
- 2:00 PM UTC-07:00
- Set-aside
- Not stated
- Notice type
- Sources sought
- Posted on SAM.gov
- Aug 27, 2026
- Archives Aug 27, 2027
Description
This project consists of furnishing all labor, materials, and equipment in connection with the construction of Phase 4 of the Rio de Flag Mainstem project in Flagstaff, Coconino County, Arizona.
From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).
Contacts
Otse Adikhai · primary
Attachments
No attachment links are available here.
Record dates
- Posted on SAM.gov: Aug 27, 2026
- The agency’s publication date, as SAM.gov states it.
- First recorded by BidLookup: Oct 8, 2026
- The UTC day of the first read of SAM.gov’s listings that stored this notice.
- Last confirmed: Oct 23, 2026
- The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
- Description as published: Oct 24, 2026 (UTC)
- The date of the daily data file this text came from.
Published by the agency on SAM.gov as notice 7ade0e4bcd0949428e69215d2cb086cd. What these dates mean
Record
- Solicitation number
- W912PL26S0050
- Search the index for this number
- NAICS
- Not stated
- Contracting office
- LOS ANGELES, CA 90017-3409
- SAM.gov notice ID
- 7ade0e4bcd0949428e69215d2cb086cd