Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the
entirety of the tank, and replace the audible and visual alarms.
o Fix the remote containment basin drainage issue.
o Replace the asphalt on the NE side of the fueling facility.
o Repair the refueler parking concrete.
o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump.
o Replace the asphalt near the loading/unloading facility with a concrete path.
o Replace POL building of the same size and at the same location.
o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS.
o Relocate the generator that is inside the compartmentalized area.