VETERANS AFFAIRS, DEPARTMENT OF › NATIONAL CEMETERY ADMIN (36C786)
S201--Amendment 0001 - Janitorial Services for Richmond National Cemetery & Satellite Cemeteries
Key facts
- Response deadline
- Nov 27, 2026
- 4:00 PM UTC-05:00
- Set-aside
- SDVOSBCService-disabled veteran-owned
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Notice type
- Combined synopsis/solicitation
- Posted on SAM.gov
- Nov 19, 2026
- Archives Nov 28, 2026
Description
Show the full descriptionShow less
5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 36C78627Q0023 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __1_______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B.End of the preview. Use “Show the full description” above to read all of it.
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
36C78627Q0023
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __1_______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the
offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not,
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter
or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to
the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print)
(Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign)
(Signature of Contracting Officer)
1
11
0001
11/19/2026
36C786
Department of Veterans Affairs
National Cemetery Administration
Contracting Services
18434 Joplin Road
Triangle VA 22172
36C786
Department of Veterans Affairs
National Cemetery Administration
Contracting Services
18434 Joplin Road
Triangle VA 22172
11/2/2026
X
X
X
The purpose of this Amendment is to extend the due date for Quotes to November 27, 2026. This amendment also answers questions submitted by Potential Quoters and provides revised documents. See Continuation Pages.
Reminder: Include a signed and dated copy of this amendment, and any potential future amendments, in your quotation package.
Sarah Poole
Contract Specialist
Page 4 of 4
CONTINUATION PAGE
The following questions and answers were received from potential Quoters. Similar or duplicate questions were consolidated into a single question and response.
Question 1 The Statement of Work defines DAILY as "Monday through Friday, including national holidays," while the General Requirements state service is performed Monday through Friday "excluding Federal holidays." Please confirm whether service is required on Federal holidays. Does the holiday exclusion apply to all daily services, including cleaning of the staffed historic lodge and emptying the five exterior trash receptacles? Please also confirm the first required performance day of the base period, given that the base-year period of performance begins Friday, January 1, 2027 (New Year s Day) (Attachment B, page 16).
Answer 1 Services are required Monday through Friday, EXCLUDING Federal Holidays. No services are required on Federal Holidays. If the first day of the Period of Performance is a federal holiday, services will not be required on that day. The Statement of Work has been updated to reflect the change. See revised Statement of Work.
Question 2 The General Requirements refer to a Federal holiday table "on page one." Please provide the holiday table or confirm the 11 Federal holidays apply.
Answer 2 A list of Federal Holidays has been added to page one of the revised Statement of Work. Federal Holidays include: New Year s Day, Birthday of Martin Luther King Jr, President s Day, Memorial Day, Juneteenth, Fourth of July, Labor Day, Columbus Day, Veterans Day, Thanksgiving, and Christmas.
Question 3 - Please confirm the make/model or size of the toilet paper, paper towel, and soap dispensers at each cemetery restroom and the Lodge, as well as the total number of each.
Answer 3 There is one (1) 11x6 toilet paper roll holder in the outside restroom at Fort Harrison that uses standard two-ply toilet paper rolls and can hold two at a time. There are ten (10) other standard toilet paper holders between all other locations, to include inside the lodge at Fort Harrison, that shall use two-ply toilet paper. There are seven (7) paper towel holders across all locations. The type of paper towel rolls to be used are the kind bought for home kitchens; there are no flat paper towels used at any location. There are no commercial, refillable soap dispensers. Contractor shall provide ten (10) disposable, anti-bacterial soap bottles to be used across all locations. It is up to the Contractor whether to refill those bottles or replace them each time they are empty. There are no brand requirements for any of these products.
Question 4 - For the semiannual Lodge cleaning (CLIN x007), please confirm the approximate number of windows and whether any second-story exterior windows require a lift or ladder access.
Answer 4 There is a total of twenty (20) windows on the Fort Harrison lodge; twelve (12) on the first floor and eight (8) on the second floor. All windows require cleaning on the inside and outside. Paragraph A.4.1. in the SOW states that the most conventional method should be used to ensure maximum results.
Question 5 Past performance: may the offeror's list of prior janitorial contracts include contracts performed by a proposed subcontractor (an SDVOSB or other small business that will do part of the work), as long as the offeror performs as required by VAAR 852.219-75?
Answer 5 Past performance is not a requirement of this solicitation; only experience was requested under the technical qualifications section. Past Performance and experience are different. For the experience requirement under the technical evaluation section, experience should be that of the Prime. If the subcontractor also has experience, you may include their experience as well.
Question 6 - Wage determination: please post a readable copy of the applicable wage determination, or give its number and revision.
Answer 6 The Wage Determination number and revision is listed in the Attachment section on the first page of the combined synopsis solicitation. It is SCA Wage Determination 2015-4313 Rev. 35. See attached.
Question 7 - Cleanable square footage The Statement of Work scopes the work by facility count and does not state the cleanable square footage for each site. Could you provide the square footage of the restrooms, lodge, and other cleanable areas at each of the five cemeteries?
Answer 7 Square footage is as follows:
Fort Harrison 1871 total sq ft
Lodge
Carpeted (stairs and office space) 250 sq ft
Kitchen 7x12
Upstairs restroom 13 x 6
Outside porch 12 x 15
Outside restroom 12 x 7
Glendale restrooms
1 18.5 x 7.5
1 17.5 x 7.5
City Point restrooms
1 - 11 x 5
1 - 7 x 6
Richmond restrooms
1 6 x 6
1 5.5 x 6.5
Seven Pines restroom
1 7 x 15
Question 8 - Is the monthly price fixed regardless of the number of service days in the month, and do the no-service days count toward the missed-cleaning limits?
Answer 8 Attachment B has been updated to reflect a unit of Daily (DA) for all CLINS, except CLIN X0007. When the Contractor misses a day of cleaning, they will not invoice for that day, and it will count towards their missed-cleaning limit. Federal holidays do not count towards the missed-cleaning limit.
Question 9 Could you identify the contractor and contract value for the janitorial services performed at these cemeteries from 2024 to 2026? Identify material changes in locations, areas, frequencies or periodic work; and confirm whether a sixth location was removed from the prior requirement. Will an incumbent employee seniority list be provided to establish applicable vacation entitlements?
Answer 9 Incumbent is Empire Facility Services, contract number 36C78625C50076, awarded 12/18/2024 for $ 424,942.38. This contract included one additional cemetery (Cold Harbor NC) that is not included in the current requirement. There are no other significant material changes. An incumbent employee list will not be provided.
Question 10 - Is the semi-annual price quoted per occurrence for all five sites combined, or per site?
Answer 10 The semi-annual cleaning is only required for the Fort Harrison lodge. It should be priced per occurrence. The Price Schedule lists a quantity of two (2); one for Spring and one for Fall.
Question 11 - Please confirm that the applicable minimum cash wage for janitors under this contract is $17.75 per hour under Executive Order 14026, rather than the $16.44 per hour shown in Wage Determination 2015-4313, Rev. 35.
Answer 11 The rate shown on this wage determination for Janitors is $16.44. This wage determination does not reflect EO 14026 as being applicable.
Question 12 - In the event the roads are not in the best conditions to travel on, will the customer understand the delay in service?
Answer 12 FAR 52.212-4 Terms and Conditions Commercial Products and Commercial Services provides a list of excusable delays in paragraph (f). If the roads are not in good condition due to one of the excusable delays listed, then the delay in service will be understood. The Contractor should contact the Contracting Officer Representative (COR) to notify them of the delay and status of service.
Question 13 - Would it be possible to provide the number of visitors at each of the five cemeteries during 2025? If available, we would appreciate having the figures broken down by location.
Answer 13 This information is unknown. There is no way to track the visitors at these locations.
Question 14 Provide the required liner sizes for interior cans and the five exterior receptacles.
Answer 14 Interior trash receptacles use 7 10 gallon trash bags. Exterior receptacles use fifty (50) gallon trash bags.
Question 15 - Is there a designated janitorial station or storage area available at each cemetery location where the contractor can keep cleaning supplies and equipment? If so, could you confirm which locations have these facilities?
Answer 15 No, the only location that has available space to store supplies is the Fort Harrison lodge. There is a spare room off the kitchen where items can be stored, but the Government is not responsible for any lost, stolen, or damaged items.
Question 16 - Attachment A identifies a staffed historic lodge only at Fort Harrison National Cemetery and does not describe how contractor personnel will obtain daily access to the public restrooms and exterior trash receptacles at City Point, Glendale, Richmond, and Seven Pines National Cemeteries. Please describe the access procedures for each location, including keys or codes, opening and closing responsibilities, and any badging or escort requirements.
Answer 16 Fort Harrison is staffed, so the lodge and the public restroom will be open during the hours specified in the SOW. The public restrooms at the other locations are open and therefore do not require a key or access code to gain entry.
Question 17 Attachment A, page 11, states that the Contractor shall not miss more than four cleanings in a month, and no more than one in a week, and that when the Contractor misses a day of cleaning, the Contractor will not be paid. Attachment B prices the daily work as monthly firm-fixed-price CLINs. Please explain how a missed daily cleaning will be deducted from those monthly CLINs.
Answer 17 Attachment B has been updated to reflect a unit of Daily (DA) for all CLINS, except CLIN X0007. When the Contractor misses a day of cleaning, they will not invoice for that day.
Question 18 - Please confirm that, on each required service day, all five cemetery locations must be serviced within the 7:30 a.m. to 4:00 p.m. window stated on pages 10 11, and whether work may be performed at any time during that window.
Answer 18 Yes, 7:30am 4:00pm EST is the duty day and that is the window of operations in which daily service are required to be fulfilled. The Contractor may choose to perform services anytime between those hours, but must be finished by 4:00 pm EST.
Question 19 Attachment A.1 (page 15), the daily restroom checklist, includes a line for WIPE/DISINFECT GRAVESITE LOCATOR, which does not appear in the cleaning procedures in sections A.1 through A.4. Is cleaning of gravesite locators required? If so, how many locators are at each cemetery, and at what frequency must they be cleaned?
Answer 19 No, cleaning of gravesite locators is not required; there are no gravesite locators at any of these locations. This verbiage has been removed from Attachment A.1.
Question 20 For the Fort Harrison Historic Lodge wood floors, Attachment B CLIN 0006 (page 16) states dry sweep upstairs hardwood floors (3 rooms), while Attachment A, section A.2, item 5 (page 12) requires wood floors to be swept and damp mopped, with Mop and Glo as the approved chemical. Which method is required for daily performance? Please also confirm the required daily method for the employee restroom floor.
Answer 20 Wood floors shall be swept and damp mopped with the approved chemical, which is Mop and Glo, or equal product. Paragraph A.2.5 in the SOW states that tile floors shall be swept and wet mopped daily, which includes the employee restroom in the lodge.
Question 21 Attachment C is SCA Wage Determination 2015-4313, Revision 35, dated August 11, 2026. FAR 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026, is also incorporated (page 6). Attachment C lists occupation 11150 Janitor at $16.44 per hour and does not include an Executive Order 14026 minimum-wage note. Please confirm: (a) that WD 2015-4313, Revision 35, applies to all five places of performance, including City Point National Cemetery in Hopewell; (b) whether FAR 52.222-55 applies to a contract awarded under this solicitation; and (c) the applicable minimum hourly rate as of January 1, 2027, if that rate is higher than the listed wage-determination rate. Please also identify the applicable wage-determination occupation for the semiannual interior and exterior window cleaning in section A.4 and CLIN 0007.
Answer 21 FAR 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 has been removed from the revised Combined Synopsis Solicitation. WD 2015-4313 applies to all locations. Quoters should base their quote on the rates listed in the Wage Determination, not FAR 52.222-55. Wage Determination 2015-4313 Revision 35 is the most recent rate. Future rates are not yet known. Occupations and rates to be used, are:
Occupation 11150 Janitor - $16.44
Occupation 11360 Window Cleaner - $18.36
Question 22 Section A.4 and CLIN 0007 describe semiannual cleaning as Early Spring & Fall but do not specify the performance windows. Please identify the required or acceptable months or date ranges for those two cleanings in each period of performance.
Answer 22 Early Spring is considered March through May, and early Fall is considered September through November.
Question 23 - The QUOTATION FORMAT AND SUBMITTAL INFORMATION section (pages 3 4) requires three separate Adobe PDF volumes on company letterhead, submitted by email to the individual listed in the RESPONSE TO REQUEST FOR QUOTATION section. The Response section on page 2 names two addressees. Please confirm whether all three volumes should be sent in one email to both addressees, whether there is a maximum file size per email or attachment, and whether Volume B is subject to a page limit.
Answer 23 Yes, all three volumes can be sent in one email to both addressees. There is no known maximum file size, but it must be able to be sent and received via email. Volume B is not restricted to a page limit, but it is recommended to only include requested information.
Question 24 - The solicitation incorporates FAR 52.219-14, Limitations on Subcontracting (OCT 2022) (DEVIATION NOV 2025), by reference (page 6) and requires a completed VAAR 852.219-75, VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (OCT 2026) (Deviation) (pages 7 8). That certificate is marked for Services and states that the contractor will not pay more than 50% of the amount paid by the Government to firms not listed in SBS as SDVOSBs or VOSBs, and that other direct costs may be excluded to the extent they are not the principal purpose of the acquisition. Please confirm that VAAR 852.219-75(a)(1)(i) is the compliance measure that will apply at award and during performance, and whether contractor-furnished consumable supplies and materials (including toilet paper, paper towels, liners, and soap dispensers) are other direct costs that may be excluded from that base.
Answer 24 Contractors are required to comply with VAAR 852.219-75, but toilet paper, paper towels, liners, and soap dispensers, are NOT considered other direct costs that may be excluded.
Question 25 - FAR 52.228-5, Insurance Work on a Government Installation (JAN 1997), is incorporated (page 7), but the solicitation does not state the required types or limits of coverage. Please identify the required insurance types and limits.
Answer 25 The insurance requirements have been added to the General Requirements paragraph of the SOW. The awardee must provide proof of the following insurance before starting performance:
Worker Compensation - $100k per accident, $500k policy limit for bodily injury by disease, and $100k per employee for bodily injury by disease.
General Liability - $500k per occurrence
Auto - $200k per person/$500k per occurrence for bodily injury and $20k property damage
Question 26 - The solicitation does not appear to require a bid guarantee, performance bond, or payment bond. Please confirm whether any surety or guarantee is required at quotation, at award, or before performance and, if so, the required form and amount.
Answer 26 There is no surety or guarantee required for this solicitation or at time of award.
Question 27 - Attachment A, page 10, requires performance in accordance with the NCA Environmental Management System (EMS) and states that copies may be obtained from the cemetery director or at http://vaww.nca.va.gov/legreg/legregdirhand.asp. That address appears to be on the internal VA network. Please provide, or post as a solicitation attachment, the EMS requirements that apply to this work.
Answer 27 This is no longer a requirement of this contract, so the verbiage has been removed from the SOW. Please see revised SOW.
Question 28 - May a quoter who did not attend the November 12 site visit still submit a quote, and is any site access still possible before the quote due date?
Answer 28 Yes, anyone can submit a quote, but there will not be any other official site visits. Per the Pre-Quote Site Visit paragraph of the combined synopsis solicitation, are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. Please note that, in no event shall failure to inspect one or all sites constitute grounds for a claim after contract award.
Question 29 - The SOW requires the contractor to empty five exterior trash receptacles daily and provide transportation. However, the designated waste disposal arrangements are not specified. Are Government-provided dumpsters or designated waste disposal areas available at all five cemetery locations? If not, is the contractor responsible for transporting collected waste off-site and arranging disposal at its own expense?
Answer 29 There is one (1) bulk trash dumpster located at Fort Harrison National Cemetery that can be used to dispose of collected waste. If the Contractor does not use this dumpster, they are responsible for arranging disposal at their own expense.
Question 30 - The solicitation requires quoters to provide information regarding employee background checks, training, and applicable safety procedures. Are there specific Government-mandated background checks, security clearances, personnel identification requirements, or facility access credentials that contractor employees must obtain before beginning performance? Are there any additional insurance coverage limits, minimum staffing requirements, or subcontractor-specific qualifications beyond those expressly identified in the solicitation?
Answer 30 No, there are not any specific credentials or requirements before beginning performance, since access is only provided during business hours, but we do want Quoters to tell us if they conduct employee background checks, what kind of employee training will be provided, and what will be done to comply with applicable safety requirements. Insurance coverage limits were addressed in Answer 28. There are no other staffing requirements or subcontractor specific qualifications beyond those already identified.
Question 31 Please confirm whether any specialized treatment or restrictions apply to the historic building s windows, hardwood flooring, or other historic surfaces.
Answer 31 There are no additional restrictions beyond what is already mentioned in the combined synopsis solicitation for the historic building s windows, hardwood flooring, or other historic surfaces.
Question 32 - The Statement of Work references heavy bleach solutions, COR-approved disinfecting wipes, and Mop and Glo. Will the government provide approved product specifications, dilution requirements, or other guidance to ensure compatibility with historic building materials and compliance with applicable safety requirements? May equivalent products be used with prior COR approval?
Answer 32 The Awardee will present their products for approval prior to start of performance. Yes, all brand name products are brand name or equal. The SOW has been updated to reflect this terminology. When diluting products, follow the manufacturer s label or instructions.
Question 33 - Are the cemetery grounds and public restroom facilities subject to routine security patrols, surveillance, or other security measures? Additionally, are there established procedures for janitorial personnel to report unauthorized access, vandalism, property damage, or other security-related concerns encountered during scheduled cleaning?
Answer 33 Cemetery personnel do visit each cemetery frequently, and are not limited to other means of surveillance. If the Contractor observes anything considered unusual, it should be reported to the COR, along with pictures, if needed.
Question 34 - For purposes of estimating cleaning labor and material requirements, have any of the public restroom facilities experienced recurring vandalism, property damage, or conditions requiring cleaning beyond the routine services described in the Statement of Work? If so, please clarify whether such additional cleaning is included in the fixed-price requirement or handled separately.
Answer 34 If anything beyond the normal scope of work occurs, it will be addressed separately from the contract.
Question 35 Is stripping, sealing, waxing or machine buffing required beyond the methods expressly stated in the SOW? If so, please identify the locations, areas and frequencies.
Answer 35 No, none of these methods are required.
Question 36 - Will the Government consider National Cemetery Administration grounds maintenance, cemetery upkeep, and specialized facility cleaning contracts as relevant past performance when evaluating technical capability, particularly when the offeror also demonstrates federal custodial and janitorial experience?
Answer 36 We are requesting experience, not past performance. All experience included should be related to janitorial services. The experience does not have to be with federal agencies, but the type of work should be similar.
ATTACHMENTS:
Revised Combined Synopsis Solicitation (includes revised SOW, revised Price Schedule, and SCA Wage Determination 2015-4313 Rev. 35)
Contacts
Sarah Poole · primary
703-630-9369
Attachments
BidLookup records the links this notice gives. It has not downloaded or checked the files.
Record dates
- Posted on SAM.gov: Nov 19, 2026
- The agency’s publication date, as SAM.gov states it.
- First recorded by BidLookup: Nov 19, 2026
- The UTC day of the first read of SAM.gov’s listings that stored this notice.
- Last confirmed: Nov 19, 2026
- The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Published by the agency on SAM.gov as notice 65b3c9a366b24392a39f7ddc904806f7. What these dates mean
Record
- Solicitation number
- 36C78627Q0023
- Search the index for this number
- NAICS
- 561720 · Janitorial Services
- Product/service code
- S201 · HOUSEKEEPING- CUSTODIAL JANITORIAL
- Place of performance
- Richmond, Virginia 23231
- Contracting office
- QUANTICO, VA 22134
- SAM.gov notice ID
- 65b3c9a366b24392a39f7ddc904806f7