655-23-101 Site Water Loop Replacement

Key facts

Response deadline
No deadline given
Set-aside
SDVOSBCService-disabled veteran-owned
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice type
Presolicitation
Posted on SAM.gov
Nov 4, 2026
Archives Dec 4, 2026

Description

The project’s general scope of work is to furnish all tools, equipment, material, permits, labor, supervision, and all other necessary resources to accomplish the following work: This project replaces a portion of the existing campus water loop piping and existing campus water loop isolation valves. The project also includes installing a water booster pump that will be powered by a new equipment branch of emergency power in Building 22. For the new equipment branch of emergency power to be added, new wiring will feed from Building 19 (generator building) utilizing an existing underground conduit to Building 22 to feed a new emergency power distribution panel which will replace the existing emergency power distribution panel that does not meet code requirements. Installation of a new automatic transfer switch and panelboard along with wiring and conduits will be required to create the new equipment branch of emergency power. The project will also disturb many portions of the existing asphalt roadways and parking lots as well as concrete sidewalks and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as shown on the drawings and repair any areas of the landscaping and lawn that get disturbed during the project. The existing campus water loop piping is located below many of the existing campus roadways and sidewalks, and it is anticipated that most of the new piping will be as well.
Show more
Therefore, this project shall be completed in phases to allow campus access for employees and Veterans and maintain water service until a tie-in to an existing building service pipe is to take place. If a shutdown of water service for any building is required during the duration of the project, it must be coordinated with the COR. Period of performance is 300 calendar days from receipt of the Notice to Proceed.

From SAM.gov’s daily data file, as published on Nov 10, 2026 (UTC).

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Nov 4, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Nov 4, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 10, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Nov 10, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 5bf406a8dd4a4472833e4ab127bf7036. What these dates mean

Record

Solicitation number
36C25027B0006
Search the index for this number
NAICS
236220 · Commercial and Institutional Building Construction
Product/service code
Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES
Place of performance
Saginaw, Michigan 48602
Contracting office
DAYTON, OH 45428
SAM.gov notice ID
5bf406a8dd4a4472833e4ab127bf7036