Skip to main content

← All opportunities

DEPT OF DEFENSE › DEPT OF THE ARMY › AMC › ACC › MISSION INSTALLATION CONTRACTING COMMAND › 419TH CSB › W6QM MICC-FT DRUM

Sling Load Training Blocks

Key facts

Response deadline
Dec 24, 2025
4:55 PM UTC-06:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Combined synopsis/solicitation
Posted on SAM.gov
Dec 18, 2025
Archives Dec 18, 2026

Description

4x external load training (2x 15k, 1x 12k, and 1x 6k) blocks IOT replace the current deteriorating training blocks, enhance ability to train aircrews on external load procedures associated with L2A2 operations, and prepare for ARSTRUC lift asset increase. Blocks will meet criteria outlined in Natick Center Technical Data Package (TDP) 11-1-7752, addendum 01, which is the most current.2 X 15K Sing Block(s)- Construction: Concrete and rebar constructed training block allowing aircrews to train effectively while minimizing potential damage to Army equipment. Construction of the 15K block will follow the 18K technical data outline in 11-1-7752. This requires the vendor to proportionally scale down the volume, only reducing the length of the block, while maintaining the lifting provision dimension locations per the Technical Data Package. - Color -Coded: Training blocks adequately simulate common externally loaded cargo essential to the mission of the 101st Division (AASLT) (e.g., M1167, M1152A1 with Mobility Trailer). This weight also provides adequate training to prepare aircrews to transport dual ISVs rigged in the shotgun configuration ? vital to successful L2A2 Operations. 1 X 12K Sling Block- Construction: Concrete and rebar constructed training block allowing aircrews to train effectively while minimizing potential damage to Army equipment. Construction will be IAW with technical data in the attachments. - Color -Coded:
Show more
Each Block shall be color-coded IAW the table below, integral ready-mic concrete dyes, such as those available from Solomon Colors, QC Construction Products or Davis Colors: - Block adequately simulates M777A1, M1097 w/ High Mobility Trailer, etc. 1 X 6K Sling Block- Construction: Concrete and rebar constructed training block allowing aircrews to train effectively while minimizing potential damage to Army equipment. Construction will be IAW with the attachment below. - Color -Coded: Each Block shall be color-coded IAW the table below, integral ready-mic concrete dyes, such as those available from Solomon Colors, QC Construction Products or Davis Colors. - Block adequately simulates M119A3, Container Roll-In/Out Platform (CROP), etc. Manufacturer Data Plate (Per Block):- Provide nameplate with block weight, manufacturer, manufactured date, unique local serial number, and that the block was made in accordance with this drawing to each weight. Made of brass, 4? Wide X 8? Long X 1/16? This (minimum) anchored with 4, ?? x 2 ?? screws in expansion shields on block top surface as shown in the attachments.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

No attachment links are available here.

Record dates

Posted on SAM.gov: Dec 18, 2025
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 4f65f61f43124cb8a6f525d3fee63556. What these dates mean

Record

Solicitation number
W911S226U2330
Search the index for this number
NAICS
333120 · Construction Machinery Manufacturing
Product/service code
3940 · BLOCKS, TACKLE, RIGGING, AND SLINGS
Place of performance
42223
Contracting office
FORT DRUM, NY 13602-5220
SAM.gov notice ID
4f65f61f43124cb8a6f525d3fee63556