Skip to main content

← All opportunities

HEALTH AND HUMAN SERVICES, DEPARTMENT OF › INDIAN HEALTH SERVICE › DIV OF ENGINEERING SVCS - SEATTLE

Rosebud Lift Station Construction

Key facts

Response deadline
Dec 1, 2026
5:00 PM UTC-05:00
Set-aside
Not stated
Notice type
Solicitation
Posted on SAM.gov
Nov 25, 2026
Archives Mar 31, 2027

Description

Show the full description
Amendment A01: 1. The purpose of this solicitation amendment A01 is to update the Contract Specialist. 2. The Contract Specialist and point of contact for this action is changed from Daniel Cotto to Robert Miller. 3. Robert Miller's contact information is [email protected], 325-518-0521. 4. All other terms and conditions remain unchanged. The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings.End of the preview. Use “Show the full description” above to read all of it.

Amendment A01:

1. The purpose of this solicitation amendment A01 is to update the Contract Specialist.
2. The Contract Specialist and point of contact for this action is changed from Daniel Cotto to Robert Miller.
3. Robert Miller's contact information is [email protected], 325-518-0521.
4. All other terms and conditions remain unchanged.

The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow.

A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration.

This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection.  This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment.

Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Nov 25, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Nov 25, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 25, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.

Published by the agency on SAM.gov as notice 2550bb46570d425a8ef929647ca0577a. What these dates mean

Record

Solicitation number
75H70127R00007
Search the index for this number
NAICS
237110 · Water and Sewer Line and Related Structures Construction
Product/service code
Y1ND · CONSTRUCTION OF SEWAGE AND WASTE FACILITIES
Place of performance
Rosebud, South Dakota 57570
Contracting office
SEATTLE, WA 98121
SAM.gov notice ID
2550bb46570d425a8ef929647ca0577a