DEPT OF DEFENSE › DEPT OF THE ARMY › US ARMY CORPS OF ENGINEERS › ENGINEER DIVISION SOUTH ATLANTIC › ENDIST WILMINGTON › W074 ENDIST WILMINGTON
Sources Sought Notice for Coastal Storm Risk Management (CSRM) At Surf City, North Carolina
Key facts
- Response deadline
- Jul 17, 2026
- 3:00 PM UTC-04:00
- Set-aside
- Not stated
- Notice type
- Sources sought
- Posted on SAM.gov
- Jul 2, 2026
- Archives Jun 30, 2027
Description
This is a Sources Sought/Request for Information only. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award. The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to perform Coastal Storm Risk Management. The area of consideration for this dredging service is: Surf City, Pender County, North Carolina. CSRM Estimated Quantity: 6,500,000 CY. Environmental Window: N/A. The work consists of furnishing plant, labor, materials, and equipment to perform dredging, transporting, placing and shaping beach fill and performing all pre and post construction beach surveys. Approximately 1 borrow areas is available for the project and located offshore of Topsail Island Beaches at the south end of the island. The Surf City Coastal Storm Risk Management Project consists of placing 6,500,000 CY of Dune and Berm beach fill along approximately 33,300 LF of Surf City Beach. This project shall use either an ocean certified hopper and/or an ocean certified pipeline dredge. The project also consists of extending approximately 40 existing walkover structures in Surf City and the stabilization of approximately 46 to 56 acres of new dune. The solicitation is expected to be available in FY2027.See the attached document with additional details.
From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).
Contacts
Rosalind Shoemaker · primary
Terri Adams · secondary
Attachments
No attachment links are available here.
Record dates
- Posted on SAM.gov: Jul 2, 2026
- The agency’s publication date, as SAM.gov states it.
- First recorded by BidLookup: Oct 8, 2026
- The UTC day of the first read of SAM.gov’s listings that stored this notice.
- Last confirmed: Oct 23, 2026
- The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
- Description as published: Oct 24, 2026 (UTC)
- The date of the daily data file this text came from.
Published by the agency on SAM.gov as notice 24097d37f1c54e4696498857a4bf77fa. What these dates mean
Record
- Solicitation number
- W912PM27BA001
- Search the index for this number
- NAICS
- 237990 · Other Heavy and Civil Engineering Construction
- Product/service code
- Y1KF · CONSTRUCTION OF DREDGING FACILITIES
- Place of performance
- 28445
- Contracting office
- WILMINGTON, NC 28403-1343
- SAM.gov notice ID
- 24097d37f1c54e4696498857a4bf77fa