Skip to main content

← Back to results

DEPT OF DEFENSE › DEPT OF THE ARMY › US ARMY CORPS OF ENGINEERS › ENGINEER DIVISION SOUTH ATLANTIC › ENDIST JACKSONVILLE › W074 ENDIST JACKSNVLLE

INTRACOASTAL WATERWAY MAINTENANCE DREDGING VICINITY OF BAKERS HAULOVER, MIAMI-DADE COUNTY, FLORIDA.

Key facts

Response deadline
May 13, 2026
2:00 PM UTC-04:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Solicitation
Posted on SAM.gov
Apr 30, 2026
Archives Apr 30, 2027

Description

THIS NOTICE IS POSTED FOR INFORMATIONAL PURPOSES ONLY: NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010: AGM Marine Contractors Inc. (W912EP25D0011), AHTNA Marine and Construction Company LLC (W912EP25D0012), Atlantic and Gulf Dredging and Marine LLC (W912EP25D0013), Coastal Dredging Co., Inc. (W912EP25D0014), Cottrell Contracting Corporation (W912EP25D0015), Next Generation Logistics LLC. (W912EP25D0016), Southern Dredging Co, Inc. (W912EP25D0017), Southwind Corporation Corp. (W912EP25D0018) and Waterfront Property Servies LLC Gator Services (W912EP25D0019). DESCRIPTION OF WORK: Project consists of maintenance dredging the Intracoastal Waterway (IWW) channel and settling basin in the vicinity of Baker Haulover. Place excavated material in the beach placement area south of Bakers Haulover Inlet, as shown on the plans. Incidental work includes but not limited to environmental monitoring, water quality monitoring, benthic surveys, beach fill quality control, vibration control and monitoring, and beach tilling. The Request for Proposals (RFP) will be issued on or about 13 April 2026 and proposals will be due on or about 13 May 2026. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million. The Price Target Range is between $1,000,000.00 and $5,000,000.00. The period of performance associated with this requirement is: 100 calendar days after receipt of the Notice to Proceed (NTP).
Show more
The contractor shall commence work within 60 calendar days of receipt of the Notice to Proceed (NTP). THIS IS A TOTAL SMALL BUSINESS SET-ASIDE REQUIREMENT.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Apr 30, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 8, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 23f5c051965e4220bb7f3c020a7d399a. What these dates mean

Record

Solicitation number
GROUP1-26-R-J001
Search the index for this number
NAICS
237990 · Other Heavy and Civil Engineering Construction
Product/service code
Z1KF · MAINTENANCE OF DREDGING FACILITIES
Contracting office
JACKSONVILLE, FL 32207-0019
SAM.gov notice ID
23f5c051965e4220bb7f3c020a7d399a