Skip to main content

← All opportunities

HOMELAND SECURITY, DEPARTMENT OF › US COAST GUARD › SFLC PROCUREMENT BRANCH 2(00085)

USCGC Healy Fire Alarm System troubleshooting

Key facts

Response deadline
Sep 24, 2026
8:00 AM UTC-07:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Combined synopsis/solicitation
Posted on SAM.gov
Sep 17, 2026
Archives Oct 9, 2026

Description

Statement of Work SIEMENS Fire Alarm System Troubleshooting USCGC Healy 1. GENERAL 1.1 Background The objective of this project is to perform a comprehensive inspection and repair of the existing fire alarm control panel and detectors onboard CGC HEALY. The contractor must perform a groom of the system to resolve insistent trouble alarms. The contractor must be a Siemens technical representative with ability to program newly installed detector heads into system. 1.2 Period of Performance The period of performance is fourteen (14) calendar days from date of contract award for three (3) working days. All work to be done onboard CGC HEALY at USCG Base Seattle Terminal 46. 1.3 Delivery Location Services to be performed at: USCG Base Seattle 1519 Alaskan Way S Seattle, WA 98123 POC: LT Stephen Bruno 1.4 References •Coast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General Drawings•ALARMCO, INC Operation and Maintenance Manual 2. SCOPE OF WORK CLIN 0001:The contractor must provide all labor, materials, tools, and equipment necessary to complete the following tasks: 2.1 Clearing Alarms and Troubleshooting •Review and document the panel's event log to identify the source of all current and historical faults, troubles, and alarm signals. •Troubleshoot constant “Input source malfunction”, “Not Responding”, and“Communication Error” alarms that populate on FireFinder XLS Fire AlarmControl Panel.•Clear and reset all active alarms and trouble codes on the panel to return thesystem to a "Normal" operating state.
Show more
2.2 Program Detectors •Restore full capability to all fire alarm units onboard with the exception of thosehoused in Generator Room 2 (1-80-2-E).•Program unidentified detector heads into the system including those recentlyinstalled HFP-11 smoke detectors in the Magazine Compartment (1-9-2-M).•Conduct functional tests on the restored detectors to verify proper activationand comunication with the Fire Alarm Control Panel. 2.3 Fire Alarm Panel Inspection •Ensure Master Fire Alarm Control Panel in the Engineering Control Center andannunciators in Damage Control Central, and the Port and StarboardQuarterdecks are working with full button functionality. See Coast Guard Drawing420-WAGB-801-001 for guidance about the location of the spaces listed above. 3.DELIVERABLES3.1 Inspection Report A detailed inspection report to the US Coast Guard outlining findings of inspection, what repairs were conducted, which units need further work and the final result of system groom. Shall include documentation stating that the fire alarm panel and associated detectors have been restored to full functionality, or if full functionality has not been restored, include a list of specific repairs necessary to restore full functionality, including parts and necessary labor hours. 4. CLIN 002: Potential Repairs based on CFR not to exceed ($2,500 dollars)4.1 Pricing for any additional travel costs, material, or field service days will be requested and handled by the KO under the terms of the contract. Any repairs beyond the base scope identified because of the troubleshooting shall be documented in a Condition Found Report (CFR) with a technical description of the recommended repairs. The CFR shall be provided to the Technical POCs and the Contracting Officer. 4.2 Any additional work will be authorized only by the KO through a written contract modification. The contractor shall not perform any repairs beyond the base scope until specifically authorized in writing by the KO. If the Government elects to proceed with additional repairs, the KO will issue a written contract modification that identifies the authorized additional work and associated firm fixed price. The 5. Detector List Provide a table of all detectors, including at a minimum: •Detector Name•Network Address•Loop•Compartment location ofAn example table format is provided below. Reference current ALARMCO, INC Operation and Maintenance Manual created during the previous Fire & Smoke Detection Replacement Project under Contract No. HSCG40-12-S-30014. Detector Name Network Address Loop Compartment Gen Rm 1 FWD 002:115 2 1-80-1-E ... ... ... ...

From SAM.gov’s daily data file, as published on Oct 9, 2026 (UTC). SAM.gov’s latest daily file no longer lists this notice.

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Sep 17, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Sep 20, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 8, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 9, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 2021e77b4e2447ffae7e12e1de2a9d23. What these dates mean

Record

Solicitation number
70Z08526Q0028041
Search the index for this number
NAICS
336611 · Ship Building and Repairing
Product/service code
J020 · MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
Place of performance
Seattle, Washington 98134
Contracting office
ALAMEDA, CA 94501
SAM.gov notice ID
2021e77b4e2447ffae7e12e1de2a9d23