ENERGY, DEPARTMENT OF › NATIONAL ENERGY TECHNOLOGY LABORATORY
66--IRA - High-Temperature Chamber Furnace
Key facts
Response deadline
Nov 16, 2026
1:00 PM UTC-05:00
Set-aside
Not stated
Notice type
Sources sought
Posted on SAM.gov
Nov 10, 2026
Archives Dec 1, 2026
Description
Show the full descriptionShow less
This amendment is to address several requests for clarifications associated with our Technical Specifications.
Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system?
A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system.
Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel?
A2: NETL is responsible for installing all necessary hardwire drops or disconnects.
Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output?
A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines.
Q4. Lead Times and Compliance: …End of the preview. Use “Show the full description” above to read all of it.
This amendment is to address several requests for clarifications associated with our Technical Specifications.
Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system?
A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system.
Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel?
A2: NETL is responsible for installing all necessary hardwire drops or disconnects.
Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output?
A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines.
Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions?
A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Nov 10, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 10, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Published by the agency on SAM.gov as notice 1c49db41c3ed48d8a2b515db088a9727. What these dates mean