ENERGY, DEPARTMENT OF › FERMILAB - DOE CONTRACTOR

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Key facts

Response deadline
Nov 17, 2026
4:00 PM UTC-06:00
Set-aside
No set-aside
No Set aside used
Notice type
Solicitation
Posted on SAM.gov
Oct 7, 2026
Archives Dec 2, 2026

Description

On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.
Show more
This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

From SAM.gov’s daily data file, as published on Oct 24, 2026 (UTC).

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Oct 7, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Oct 9, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Oct 23, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Oct 24, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 14034cd5817d49c38056351ef936d097. What these dates mean

Record

Solicitation number
RFP-376508-CD
Search the index for this number
NAICS
236210 · Industrial Building Construction
Product/service code
Z2EZ · REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
Place of performance
Batavia, Illinois 60510
Contracting office
Batavia, IL 60510
SAM.gov notice ID
14034cd5817d49c38056351ef936d097