ENERGY, DEPARTMENT OF › FERMILAB - DOE CONTRACTOR

KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

Key facts

Response deadline
Dec 18, 2026
4:00 PM UTC-06:00
Set-aside
No set-aside
No Set aside used
Notice type
Solicitation
Posted on SAM.gov
Nov 2, 2026
Archives Jan 2, 2027

Description

This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.
Show more
Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.

From SAM.gov’s daily data file, as published on Nov 10, 2026 (UTC).

Contacts

Attachments

BidLookup records the links this notice gives. It has not downloaded or checked the files.

Record dates

Posted on SAM.gov: Nov 2, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Nov 3, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 5, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Nov 10, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 0d455f653c70449796f54eea428f0d56. What these dates mean

Record

Solicitation number
RFP-383167-CD
Search the index for this number
NAICS
237130 · Power and Communication Line and Related Structures Construction
Product/service code
Z2MZ · REPAIR OR ALTERATION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION
Place of performance
Batavia, Illinois 60510
Contracting office
Batavia, IL 60510
SAM.gov notice ID
0d455f653c70449796f54eea428f0d56