Skip to main content

← All opportunities

DEPT OF DEFENSE › DEPT OF THE ARMY › US ARMY CORPS OF ENGINEERS › ENGINEER DIVISION MISSISSIPPI VALLEY › ENDIST ST PAUL › W07V ENDIST ST PAUL

Groundwater Monitoring in Wabasha County, MN

Key facts

Response deadline
Nov 18, 2026
11:00 AM UTC-06:00
Set-aside
SBASmall business (total)
Small Business Set Aside - Total
Notice type
Solicitation (originally Presolicitation)
Posted on SAM.gov
Nov 3, 2026
Archives Dec 4, 2026

Description

The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer.
Show more
Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section.

From SAM.gov’s daily data file, as published on Nov 10, 2026 (UTC).

Contacts

Attachments

No attachment links are available here.

Record dates

Posted on SAM.gov: Nov 3, 2026
The agency’s publication date, as SAM.gov states it.
First recorded by BidLookup: Nov 3, 2026
The UTC day of the first read of SAM.gov’s listings that stored this notice.
Last confirmed: Nov 10, 2026
The UTC day of the latest read that still listed this notice. It does not mean the notice is unchanged or still open on SAM.gov now, and it is not the index’s last-read time.
Description as published: Nov 10, 2026 (UTC)
The date of the daily data file this text came from.

Published by the agency on SAM.gov as notice 0d0a1ed3b2c2491580e2bdad7424c517. What these dates mean

Record

Solicitation number
W912ES27QA013
Search the index for this number
NAICS
541380 · Testing Laboratories and Services
Product/service code
F103 · ENVIRONMENTAL SYSTEMS PROTECTION- WATER QUALITY SUPPORT
Place of performance
55945
Contracting office
SAINT PAUL, MN 55101-1323
SAM.gov notice ID
0d0a1ed3b2c2491580e2bdad7424c517